Weekly Report for Week Ending August 21, 2003


 Exec. Comm. Agenda
Highlights
LSC
Administration
Hanford Observatory
Livingston Observatory
MIT
Caltech
Detector
40 Meter
TNI
LASTI
Data Analysis
Adv. LIGO Development
Past Weekly Reports

The LIGO Executive Committee Agenda for Monday  August 25, 2003 will be:

 (Meeting time: 10:30 am Pacific Time)

Open meeting 10:30 - 11:30

  1. Announcements
  2. LSC Issues (Saulson)
  3. Comments on Weekly Report
  4. WBS 1 LIGO I Construction (Lindquist)
  5. WBS 2 LIGO Lab Operations
  6. WBS 3 and 4  Advanced R&D and LIGO II (Shoemaker)
  7. CHANGE CONTROL BOARD/TECHNICAL REVIEW BOARD SESSION AS NEEDED


Special Items:


Special Announcements:


Weekly Report Highlights
 


LSC Issues (Saulson)


no report


LIGO Laboratory Administration (Lindquist)


LIGO Weekly Site Telecon (Lindquist)

There was no site teleconference held on Thursday, August 21, 2003.
The list of current actions revised to reflect the status of open actions assigned through August 7, 2003 may be found at ACTION LIST.


PROPERTY MANAGEMENT (Chargois)

From: Ed Chargois <chargois_e@ligo.caltech.edu>


DOCUMENT CONTROL CENTER (Turner, Mak)

>From: Linda Turner - turner@ligo.caltech.edu>

Web pages for the DCC give simple how-to's for document numbering, easy access to the latest on-line documents, and search capabilities for the DCC database. Take a look. . .

ACCOMPLISHMENTS

> From: Cleveland Mak <mak_c@ligo.caltech.edu>

ACTIVITY
Electronic document activity has been busy.  Processing of LSC documents for the LSC Meeting this week in Germany. 
08/21/03 Packages Faxes
In 26 25
Out 12 30

Press here to access the DOCUMENT CONTROL CENTER WEB PAGE.


COST SCHEDULE CONTROL SYSTEMS (Cunningham, Brambila, Kaufman, Salone)

From: Esther Cunningham <esther@ligo.caltech.edu>

Press here for ACCOUNTS PAYABLE HISTORY DATA .

From: "Brambila, Ruth" <Ruth.Brambila@caltech.edu>

From: Gina Salone <gsalone@ligo.caltech.edu> From: Florence Kaufman <fkaufman@ligo.caltech.edu>
SUBCONTRACTS MANAGEMENT (Petrac, Jasnow)

From: irena@ligo.caltech.edu (Irena Petrac)

From: Ed Jasnow <jasnow@ligo.caltech.edu>

SUPPORT (Baldon, Lloyd, Tischler)

>Irene Baldon

>Dorothy Lloyd >From: Ryan Tischler <rtischle@ligo.caltech.edu>

ADVANCED LIGO (Cost Schedule Control Systems) T. Frey
From: Thomas Frey <tfrey@ligo.caltech.edu>

Accomplishments:

For list of documents that are being used to develop Adv. LIGO Cost and Schedule, see http://www.ligo.caltech.edu/~tfrey/Cost_MTG_082002/

Advanced LIGO Request Project Plan for the 40-Meter Lab Upgrade continues. Cost Book Tool. Development of the Advanced LIGO Project Controls Guidebook continues.

Project Web Site for posting schedule and progress related data continues to be updated with the latest and greatest.


Reports (Lindquist)

We are working on three proposals and work plans:

I think that the FY 2004 budgets are close to a point where I can start devoting attention to the text for the Annual Report.  The supplement to the Advanced LIGO Proposal has been provided (by Gary) to the NSF.  Gary and Barry have discussed revisions to the Outreach Proposal with the various Co-PIs and we have a teleconference scheduled for Monday.

Change Control/Contingency (Lindquist)

The following change requests are open.
 
CR-030015 FY 2003 Livingston Observatory Detector Maintenance Expenses (Increment) R. Wooley July 14, 2003
CR-030016 Hanford Facilities 2.2--Divide the Large Equipment Access J. Worden July 31, 2003

Change Request CR-030016 was discussed during the Executive Committee Meeting on August 4, 2003.  Three questions were raised:

Current direction is to put this item on the liens list.  Sanders and Barish will view the facilities during the next site visits.  Notes from the discussion will be published.

Human Resources (Akutagawa)

From: Cindy Akutagawa <cindy@ligo.caltech.edu>


Quality/Safety (Tyler)

>From: Bill Tyler <tyler@ligo.caltech.edu>



LIGO Hanford Observatory (LHO) and Interferometer Operations (Raab)


------------------------- H1 -----------------------------
 

o S2-like angular control of Test Masses restored. The WFS engagement
   has been reliable and robust. Main difference is that
   all WFSs loops are now closed. The loops are still DC controlling the
   angles and at the S2 laser power level (800mW going into MC);
 

o The DC angular control of the Test Masses has proved to be not enough
   to handle the laser power increase. For this reason we began to focus
   on increasing the WFS bandwidth. We succeeded to go from DC control
   to 100mHz-1Hz angular control (depending on the WFS) with no signs
   of instabilities or oscillations. Although promising, we need to test
   this new setup at the 2.3W laser power level. 25% decrease in the
   AS_I rms was observed from the S2-like configuration to the new gain
   setup (elog luca 8/18/2003);
 

o The ISCT4 meat locker is in place and we have enough pass through
   clearance between BSC3 and the meat locker to squeeze through. The
   optics table is in place using the damped tripod (24.5") legs and
   spacers. The optic table position was adjusted 2" to the right from
   the drawing layout to accommodate the new periscope. The periscope
   top mirror was raised 2 3/4 inches to make up for the lack of height
   and beam running up hill. The light pipes are installed and fastened
   to the meat locker wall and coupled to the view ports. The end of
   the light pipes have a short bellows connecting them to the table
   enclosure. The PO beams are well center within the light pipes. The
   light pipes have acoustic damping material wrapped around them. The
   table enclosure back panels will need to be modified for the new
   light pipe and wiring perforations The wiring will come through the
   back now. The re-cabling will start today. The rack that was under
   the table now resides out side of the meat locker. I have received
   some of the new 2" Newport and CVI optics to allow us to start
   aligning beam paths. The other Newport 2" mounts ship Friday (will
   not be a show stopper). We can start cleaning all of the existing
   optics and installing the new optics and mounts today. The periscopes
   are installed to a rough position as well. Akiteru made some new
   measurements on the periscopes and the table mounted on the new legs
   prior to us putting the meat locker in place (for comparison). I am
   installing the access card reader on the meat locker tomorrow as
   well. I made up some grouting 'dams' and installed them around the
   tripod feet so we can grout the legs later on. I had the electrician
   hook up the fans and lights with a 30ft extension cord to give us
   access to power. The acoustic materials from E.A.R arrived yesterday.
   I used the 2" wide by 1/2" thick strip foam the seal the bottom of
   the meat locker to the floor. I' still need to call Acoustic
   Solutions for the fix instructions on the air intake (they sent the
   insulation materials less the adhesive and no instructions). We hope
   to finish up late Friday.   -- D.Cook
 

--------------------------- H2 --------------------------------
 

o WFS sensing matrix measured in pitch and yaw; WFS4 is the less
   sensitive of all the WFSs, RF gain was increased. For this reason,
   the AM laser characterization of WFS4 may need to be re-visited
  (see details vsanni elog 8/20/2003);
 

o 3 WFS loops closed (pitch only) -- WFS1>dETM, WFS2A>cITM and
   WFS3>RM -- in a 'H1 S2-like' configuration (see vsanni elog
   8/21/2003);
 


LIGO Livingston Observatory (LLO) and Interferometer Operations (Zucker)


no report


Detector/Technical Support (Coyne)


see also the Revision Technical Review Board (RTRB) status here [N.B.: This needs to be updated.]

Seismic Upgrade Project

Jonathan Kern

Completed dip brazing a first-article of Amit's valve calibrationfixture and the work looks fine.  Gave the OK to braze the remaining 6.

Have had several meetings with Southern Enterprises of Ponchatoula, Louisiana.  This is shop that has received the contract to machine the parts for our hydraulic actuators.

We're hashing out the fine details of production sequence and delivery, using as our target January 9, 2004 to begin HEPI installation in ETM-y.  Ed Jasnow is working with us. With our contracts awarded, we're finally able to use hard dates from the various vendors and shops and in spite of the late start a January installation look possible. The long pole in the tent remains machining and assembly of the actuators. Marcel is at MIT and working to complete and check the integration of the actuator with the EPI housing and geophones.

Note from D. Coyne: Although an early Jan start of EPI installation is possible, this schedule has absolutely no margin for problems that are likely to occur. LIGO management and the commissioning directors are aware of the possibility of a somewhat later start of the installation, though early Jan remains the teams goal.

Sander Liu

Finished writing the draft for HEPI electronic design requirement. Will send it out for peer review before finalizing document.

Ken Mailand

The fluid biological growth test is showing nothing after 37 weeks.

The assembly of the dummy load network is complete at CIT, the final design has been coordinated with MIT, to mate-up with their plumbing.

Waiting on confirmation re. LASTI plumbing.

MIT will modify the pump station base, and install the part of the plumbing that will mate to the dummy load sub-assembly.

The distribution manifolds [6] are in process all the longer lead parts have been ordered. The design is for a simplified single manifold ea.for supply and return.

The manifolds begin welding assembly tomorrow and will be complete wed. 8-27, the arrival date of the accumulators.

CDS

There was no CDS weekly meeting this week due to the LSC meeting.

Minutes from previous meetings are available in the commissioning archives

CDS Software

Rolf Bork reporting

- Updated the end station software for the LHO4k. This is the faster version of 

code developed a few weeks ago. In the process of installation, it was also 

noted that one reason the LHO4k end stations ran slower (max out at 60usec) was 

that the processors were still the older version pentiums. These were replaced 

with new units. With the combination of new software and CPU, the end station 

software is now running at ~45usec.

- Started work on putting ADC/DAC channel overflow monitors in all control 

signals, as requested by Peter, Daniel, and others a few months ago. This is 

similar as to what the LSC ADCs have had for awhile. The new end station code 

installed in the LHO4k yesterday now has this feature. For each ADC/DAC channel, 

there is a counter which reports the number of overflows/sec. There is then an 

accumulator for each optic, which sums all the ADC/DAC overflows. This 

accumulator is only reset manually or automatically if it rolls over 1 million. 

We are now in the process of adding this to the LVEA suspension controllers.

- MIT had a clock driver module failure in the new HEPI system. A replacement is 

on its way.

- Some more work was done with EPICS on a Linux box. As a test, a driver for a 8 

channel ADC / 7 binary I/O module was added and EPICS device support written to 

allow EPICS records to directly address this board. This turned out to be fairly 

simple and quick to do. What this type of thing would allow is a complete EPICS 

system on a PC (no requirement for VME) making an inexpensive system for such 

things as test systems or replacing some of our auxillary control VME systems 

with PCs.

- In this same vein, an EPICS device support routine was added to allow EPICS 

records to directly connect to the reflected memory (RFM) network used in CDS 

systems. This could allow us to remove some of the extra software that we have 

installed in systems which basically only interfaces EPICS to the RFM network 

data. Since we have limited (1) VME systems in our development system, this 

feature will also allow us to better test RFM connections prior to installing 

new software at the sites.

CDS Hardware

Rich Abbott reporting

1.  Putting together the equipment and methods to do a baseline survey of the RFI background.  I have ordered parts to facilitate data taking using our HP spectrum analyzer, and plan on using a broad band antenna that we have here.  The test will take data at various locations morning and night and repeat all data at least twice for consistency.

2.  Did some research into the type of motor controller we might order for the pump station.  So far, although I have found some interesting units, they all fall short for one reason or another.  I am starting to feel like the one we have might be the way to go even in the future.

3.  Went over data for implementing the tidal servo with Brian O'Reilly and am making plans to help him once he returns from the LSC meeting.

PSL

PeterKing

The high power photodetector boards were stuffed and the photodetector

assembled.  Apart from an oscillation out at about 16 MHz the photodetector

performed pretty much as expected.  The photodetector was operated for a

sustained period of time at approximately 350 mA.  When the light level was

increased beyond about 400 mA, the photodiode substrate was damaged.  A

circular burn mark on the substrate is easily identifiable along with a

crack in the substrate.  The bonding wire was intact however.  Another

interesting observation is that it appears that there was some vapour

inside the photodiode, as there is evidence of condensation on the window.

Errant Beam Blocks

Ken Mailand

The MC1 and MC3 baffles are being re made to eliminate any possibility of the beam striking a wire when the baffle is rotated at a high angle to the SOS. The baffles will go into the high temp bake this week, the final outside service.

Optics Analysis

Erika D’Ambrosio

I put in words some results I obtained by simulations, that are related to the

"multi-modal" nature of the electromagnetic fields and more specifically to 

the different composition of carrier and sideband light. The conclusions have 

been included in the proceeding regarding the presented poster at the Fifth 

Amaldi Conference. Although I have been doing simulations for both H1 and L1 

with all the as built parameters, I reported and commented the results for H1 

which can be summarized as follows:
 
Physical mechanism
Effect in the SB resonant curves
Possible cure
Different optical gain
Different maximum SB amplitude
ASI Servo (DS)
wrong "effective" l+
The peaks are split but SB are h.c.
Demod. phase
Different Gouy phase
"Common" off set for the two SB
No cure

Of course all the above are not independent. As far as the two output channels

are *perfectly* separated, the fact that the SB experience different losses 

does not have an influence on the signal demodulated in quadrature, since the 

phase difference between the carrier beams coming from the two Fabry-Perot 

combines with the average SB amplitude. If the carrier contrast is not ideal 

the signal demodulated in phase is non zero when the SB amplitude is 

different. There can be many causes for the SB having different maximum peaks 

but basically we can adjust l- to make their losses equivalent and restore 

balance ... BUT this has an effect on the carrier.

In principle there is no problem if l+ is not exactly 3/4*lambda_mod. Actually

even using this ideal value the SB are still complex conjugate because of the

Schnupp asymmetry: in the symmetric combination of l1 and l2 the amplitude of

the SB beams travelling along the two branches also counts. All the mechanisms

work exactly the same other than the SB are not at their maximum power and the

phase between ASI and ASQ must be appropriately adjusted to maximize ASQ.

When the interferometer is cold the mismatch between the carrier and the 

sidebands is significant enough they really experience a different round-trip 

phase w.r.t. CR. Since this entails a common phase, the real and imaginary 

part are  mixed and part of the carrier light due to a bad contrast 

contributes to ASQ. 

In this case ASI=0 and in order to check my calculations I ran 

a few simulations, with increasing differential losses in the two arms. 

As a result ASI was zero and ASQ was not but unfortunately I was not able 

to squeeze those data in the proceeding. This problem seems to me the most 

important one as the interferometers behave like they are always cold.

Optical Metrology

GariLynn Billingsley

The WYKO 6000 surface measurement interferometer shipped to Tucson for upgrade and repair.

Lee Cardenas, Liyuan Zhang

OTF Lab. (W. Bridge)

Contamination Cavity # 1 

We took out the Aluminum wire spool for the OSEM.

Results from the plots for absorption, ring down and thermal lensing will be released (Dr.Zhang)

Cleaned mirrors installed, alignment, mode match done and cavity is locked. 

took ring down and beat frequency measurements for base line.

We introduced a new sample "PEEK" wire spool four of them.Cavity is locked again and took our first

ring down measurement which it shows no change so far.

· Another sample collected. Solder joints for the OSEM assembly is in preparation as more samples needed. 

Absorption Test Measurement prototype in standby ( New laser coming soon?)

Scatterometer system 

Modification of the base holder to adapt a rotating base for the 6" Dia. X 3" thick Sapphire mirror is completed.

We completed the measurements for the surface birefringence (polarization rotation) of the sapphire- B crystal

substrate.Full scan result of the sapphire-B shows to be very consistent with our previous result. 

Please seeDr. Zhangsset-up, calibration, and full scan results plots.

OTF Lab at Lauritsen ROOM 38

Cavity #3 

It is pumping with two new mirrors from REO . The most recent ones.These mirrors were cleaned (Helena)

The previous two had higher beam scattering so we could not use them.

All these efforts are in progress. 

Cavity #2 Test cavity in STANDBY.

We will be installing a new cavity with cleaned mirrors as soon as we learn from the other cavities.


40 Meter Interferometer (Weinstein)




Thermal Noise Interferometer (Libbrecht)


no report


LASTI


no report


Data Analysis and Computing (Lazzarini)



 

Simulation and Modeling (Bhawal)
--------------------------------
 

Wave Front sensor
-------------------
(Biplab)
 Working with Luca to understand the behavior of WFS loops
 especially if the gains are increased. It was observed that H1 (real IFO)
 goes out of lock if the power is increased without increasing the gain.
 

Code development and maintenance
---------------------------------
(Melody)
 - Continuing e2e source code modification to dynamically create
   C++ source from FUNC_xxx equation modules, which would be compiled,
   combined to a shared library, and used during runtime execution.
 
Alfi
-----
(Bruce)
 Continuing work on bundles and bundlers in Alfi (PR 272.)
 
 

LIGO Data Analysis System
-------------------------
 

LDAS Software Systems
---------------------
 

(Blackburn)
The LIGO Data Computing Group Toolset (LDCG) was upgraded on several of
the standalone LDAS systems and on the tandem (dual server) system with
the GCC 3.3.1 compilers. Once this was accomplished, the version of LDAS
on these systems was rebuilt to also be based on GCC 3.3.1. Only a few
files had to be modified to be compliant with the stricter ANSI/ISO
standards imposed with this compiler. LDAS was then tested on these
systems and found to run as reliable and slightly faster than with the
previous GCC 3.3.0 compilers. The LDAS-DEV system will be upgraded by
the end of this week to be based on this GCC 3.3.1 compiler set.
 

A performance comparison of three candidate platforms used to run the
LDAS metaServerAPI and the DB2 database server was carried out this
week in order to pick the best hardware platform for the next science
run. The comparison was between the old Sun 4 CPU server, a new faster
2 CPU server from Sun, and a dual CPU Intel server. Two different classes
of tests were performed. The first suite of tests challenged only the
metaDataAPI and the database server. The second test suite was our "real
world" nightly dataPipeline/metadata access and insertion tests. The
dual Intel server won in all categories by a factor of 3 to 4 over the
original four CPU Sun server. The newer dual Sun server came in second
place being about 1.5 times faster than the original 4 CPU Sun server.
We are now performing longer term tests of the dual Intel server under
heavier loads to get a better understanding of the issues associated
with running our database server under Linux.
 

We have upgraded our MPI distribution to the newest LAM version 7.0.
Testing has been carried out on the same set of servers that the new
GCC 3.3.1 compiler was tested on and will be migrated onto the LDAS-DEV
system later this week. Preliminary tests indicate that this version of
LAM is more stable and reliable than the previous release, resulting
in significantly fewer jobs failing in the MPI layer of LDAS.  It does
continue to have a memory leak issue under single server configurations.
It has not yet been tested to determine if it generates the network
packet storms seen on large clusters.
 

An issue was discovered (or probably rediscovered) involving blocking
sends of data between the frameAPI and the dataConditionAPI in a bi-
directional mode this week. Code is being developed and tested to
attempt to handle this condition.
 

Continued to improve documentation for various LDAS webpages.
 

Continued to read C++ code in search of poorly implimented use of
container methods.
 

Began development of an interface in the controlMonitorAPI and functionality
in the managerAPI to allow any LDAS user to have their account temporarily
blocked with unattended open loop scripts are causing distructive behavior
on an LDAS system. This is based on experiences during the previous science
runs and originated with a request from Greg Mendell.
 

The process coredump monitoring software (corewatch) was modified to allow
it to correctly monitor and manage coredumps that are very close together
in the LDAS system.
 

Began evaluating the new BWidget TCL/TK package version 1.6 for inclusion
in the next release of LDAS. This package is used by the controlMonitorAPI
and has several nice bug fixes in it for us, but also has changes to its
interfaces which will require code changes in our code to make compatible.
 

(Charlton)
This week I have continued to work on the software for creating reduced
data in S3 and the future. It should be ready for initial release at the
end of the week. Things added since last time were:
 - ability to handle errors in LDAS jobs
 - ability to handle LDAS outages
 - status information that can be monitored via the dsorun web page (used
   in the control room)
 - extended logging information
 - graphical representation of raw and reduced data
 
 

LDAS Hardware Systems
---------------------
 

Caltech
-------
(Dan Kozak)
Trip to LLO:
  * Put 2Gb FC HBAs in metaserver and dataserver.
  * Installed SAN 4.2 on gateway, metaserver & dataserver.
  * Hooked up 2Gb FC switch to hosts, STK 9940Bs, L700, T3s, 3510, framebuilder.
  * Configured SAM-QFS on dataserver to use 9940Bs/L700.
  * Set up new framebuilder (SunBlade2000) with SAN4.2, standalone QFS 4.0.
  * Installed new firmware on 3510.
 

(Hari Pulapaka)
* Installing of Condor: Setting up condor took quite a bit of time, I had to
  spend a lot of time debugging condor. The main head node had 2 interfaces
  and somehow the nodes were not able to connect to the head node, so I had
  to setup a private domain group for the private subnet. So, now the nodes
  in the pool can connect to the head node but job submission is still
  creating problems.
* I was also looking after the transfer of files from UWM using LDR. The
  transfer was completed today, but it crashed many times earlier and I had
  to debug and restart it many times.
* I was also getting myself familiar with the LDR code in python.
 

(Al Wilson)
* Setting up RH9 for kickstart installation.
  Have a core set of rpm's and working directory. Testing is going well.
  Should be ready for beta by weeks end.
* Sent files to MIT for the beowulf nodes. Will help Keith with the
  installation.
 

(Stuart Anderson)
* Solved problem with incompatible firmware inside one of the 3510 RAID
  units and as a result upgraded all 10 units at Caltech.
* Successfully created a single 10TByte file on the new SAM-QFS disk
  cache (built out of 8 3510 units).
* Helped Paul Armor at UWM to get LDAS-0.7.0 running on the Medusa cluster.
* Started testing Solaris9 Maintenance Update 4 with its support for
  larger than 1TB storage devices.
* Started testing motherboard BIOS upgrade for P4DL6 systems used for
  the 5 standalone software development machines and the IDE-RAID
  servers.
 

MIT
---
(Keith Bayer)
* Installed LHO foundry switch at MIT.
* Set IP addresses on foundry switch's to 10.11.254.252 and 253.
* Installed SysKonnect cards into new datacon/beowulf nodes.
* Received gigabit cards and fiber patch cords from Caltech.
* Troubleshooting failing raid drive on pcraid#3.
* Monitored cluster node with watt measuring tool.
 

Livingston
----------
(Igor Yakushin)
* Two T3 disks failed and have been replaced.
* Dan Kozak is visiting LLO to configure the tape robot, fiber channel
  switch, 3510, fb2. Tape robot is configured, however, one of the drives
  seems to have some problems: it writes data 200 times slower than other
  drives. I called StorageTek: a technician should come this Friday. fb3
  is configured to use LDAS' T3s, however, it is running Solaris 9 (to
  work with T3s correctly, the current fb2 is running Solaris 8) which has
  not been proved yet to work with CDS software and hardware; once it is
  proved that it works, fb3 will replace fb2. 3510 firmware upgrade is in
  progress. Servers, T3s, taperobot, fb3, 3510 are using now the new fiber
  channel switch.
* Upgraded firmware on the new gige switch.
* Tested VPN connectivity from MIT to other sites. It works fine to LLO
  and LHO but I observed the same problems from MIT to CIT as from all the
  other sites to CIT. With the existing network problems it is impossible
  to use the central metaserver (as well as ldas-cit's metaserver) at CIT
  through VPN. We are going to take another look at this tonight with
  Shannon.
* The new AC has been installed in LDAS room last week and seems to
  work fine so far: I have been running very heavy load on LDAS during the
  weekend to test how AC can handle it. Some time next week the remnants
  of the old AC will be removed and hopefully LDAS room would get back
  into an ordered state.
 

Hanford
-------
(Ben Johnson)
* Reconnected the LDAS room temp monitor computer to the CDS network.
  The box is a standalone SparcStation 5 which sends the LDAS room
  temperature into the CDS EPICS system.
* Working with Dave Barker on how to allow CDS-side NDS users to have
  longer and efficent data lookback during S3 (lookback longer than 6-12
  days).
* Set IPaddr for the one 3510 at LHO to 10.10.35.10 .  It is on the
  same network as the T3's and 64-port FC switch (storage network).
* Begun process of moving the 10.10.x.y network over to dataserver. I
  can now telnet from dataserver to any device on the storage network. I
  still need to install the SUNWesm (Enterprise Storage Manager software)
  to capture the T3 logs on a regular basis.
* Continuing work on data archiving scripts for S3.
 
 

Data Analysis Activities
------------------------
 

(Creighton)
Finally managed to generate good all-sky pulsar search template meshes
for short (day-long) integrations, and started checking the code on
longer (month- or year-long) integrations.
 

(Yakushin)
Debugging parallelized version of waveburst.
 
 

General Computing (Wallace)
---------------------------
 

MIT:
(Keith)
 - Troubleshot / reinstalled windows pc
 - Working on wireless channel interference with PSFC
   Filesystem backups migrated to new SCSI drive
 -Patching Sun machines
 

Livingston:
(Shannon)
 - This week can be summed up as spending all of my time on windows
   worms and viruses.  Blaster, Welchia and SoBig.f@mm
 

Hanford:
(Christine)
 - On vacation and out sick most of last week and Monday of this week.
 - Came in off my vacation for a short time to work with Ed Chargois who
   was on site to dispose of all of our broken or excess computer
   equipment.
 - Continuing to work with Larry to get access to the Caltech ITS
   software site.  Our IP addresses are blocked by Caltech.  I am not able
   to get access to any of the site license software.
 - Working with Larry and Carol Wilkinson to get software from Caltech
   that Carol needs in order to do her job.
 - Helped Carol set up her modem to use her account on the 800 line at
   Caltech.
 - Helped a few users clean up their PCs after the worm and virus
   attacks.  One user had several trojan software programs running on his
   PC.
 - Working on Otto's computer to resolve a problem where some programs
   are unable to run properly.  At this time it appears the problem is due
   to some accessibility settings that Otto needs.
 - Resumed work on the network upgrade problem.  I've contacted PNNL
   again with the status of my most recent testing.  Last I heard from them
   someone was trying to come up with some e2e performance testing tools as
   they have nothing at this time to test with.
 - Continued working with Larry on whether he bought tech support for my
   Cisco router and if so what is the support contract number.  Larry is
   sure he bought the tech support, but can't find the contract number.  He
   will continue to investigate and get back to me.  As soon as I have a
   contract number from Larry I can open a case with Cisco tech support for
   help on the router.
 - I have opened a case with Cisco tech support for help configuring my
   internal switches.  I have 8 a.m. to 5 p.m. next business day telephone
   support for my switches.
 - Installed some software required by Biplab for e2e.
 - Will be installing a gige interface card on the cisco router.
 - Resuming the install of the Calcium calendar on our web server.
 

CIT:
(Lisa)
 - Spent a large chunk of time working on windows security issues and viruses.
   The mail server has been blocking most of the latest virus attack from the
   end user.  Still, there are a lot of error messages to read through.
 - Working in the 40m.  Started a todo list with Lisa Goggin of what we will
   need to get accomplished in the next few weeks.  I think I finally have
   the ntp issue resolved, but this doesn't get tested often, so the feedback
   is minimal.
 - Still working on a problem from last week.  ITS blocked port 135 at our
   router but some of the purchasing people need that port to get their e-mail
   from the ATC server.  This is still unresolved.
 - Reprogrammed the wireless access points many times.  When submitting mac
   address, please be careful to get the correct address for the wireless card.
   Folks have been sending in lan addresses by mistake.
 - Installed quite a few software packages on the server that will replace
   canopus.
 - Began working on a new template to make the GC internal web pages pretty.
 

(Mike)
 - Setup and installed an HP5000n printer in the 40M and removed their old
   printer that was giving them a lot of problems.
 - Worked on a PC that was having problems with the Operating System. It
   turned out that this computer had multiple viruses that I was able to clean.
   This computer is back up and running.
 - Moved and setup in Wilson House the new HP5500dn color printer from the
   40M; this included programming and loading printer drivers on existing
   workstations to connect to this printer.
 - Went all over to update all computers with OS & Security Patches.
 - Worked on updating a few laptops software & OS/Security for the loaner pool.
 - Started loading a new IBM laptop with General Computing software and
   setting up security settings. This has a built in wireless card that is
   giving me some problems that will require me to contact IBM tech support on
   this.
 - Finishing up loading a new Dell workstation to replace the VRVS system
   up on the third floor of W/B. This includes loading all General Computing
   Software plus VRVS. I am also testing & optimizing VRVS settings.
 - Worked on a scanner for DCC. I swapped out the Automatic Document Feeder
   that had been not working. I had another scanner that was not functioning
   correctly but ADF seemed to be working just fine. I swapped this out but
   hardware still needs to be tested.
 - This week I had a lot of software, e-mail, viruses and networking issues
   that kept me real busy this week.
 

(Veronica)
- LIGO website: Posted the latest newsletter. Posted updates to various
  pages. Installed a webpage for the LSC August meeting's transparencies;
  posting them as they arrive. Posted a local copy with all supporting files
  of a press release for MIT per David Shoemaker's request.
  Installed and updated a webpage for S1 papers.
  Tracked down what appeared to be a glitch with the roster database. What
  seemed like a loss of data turned out to be due to an inadvertent switch
  to an earlier copy. I restored the data so that it is now up-to-date.
  Assisted Ed Chargois in recovering data for one of his databases. This
  included installing a copy of data recovery software and repopulating a
  new database with data from another application. It appears to be working
  now.
  Thomas Frey has requested that I take over management of the roster and
  costbook databases. This will include maintenance, updates, and occasional
  design tuneups. Since I am already familiar with the roster db's
  architecture and front ends, I am looking into the costbook database
  layout.
  Minor assistance to Cleveland in setting permissions for some docs in
  /docspublic/.
  Videotaped the last seminar. Set up and monitored the VRVS webcast.
  Captured the video, encoded, and posted for streaming. Made a CD for the
  Moscow U. group with the downloadable copies of the video in various
  formats. Assisted Sergei Vyatchanin and Farid Khalili in transferring and
  converting their files. While at it, updated virus software on the laptop
  that I loaned for them.
  Addressing an issue of posting an update to the LLO website. Looked up
  animations for Tom Lucatorto. Preparing a high-resolution copy of a
  Hanford aerial.
  M82 seemed to had been hit with a virus again. I 'cleaned' it about 2
  weeks ago and keep checking it almost daily.
- LSC website: Posted various updates (most notably, S1 Author List and
  Acknowledgment of Support).
- Project Science: user support.
 

(Larry)
 - Wrapped up a number of procurement items. This included making new purchases
   for various people. Started working on the SUN maintenance contract renewal.
   We will be including some LDAS equipment but with the new person we are
   working with at SUN we should have everything worked out in about a week.
 - Supporting DCC on different fronts. It appears that Linda Turners computer
   had some major problems, so we will be doing a little more on this end in
   trying to get the LSC items posted.
 - Spent some time going over things Christine needs for the Hanford site. They
   still are not on the list to access s/w at Caltech. The software people were
   not aware the problem had not been resolved some weeks ago but assured me
   they would make sure it would be done today.
   Started contact with Cisco to find out the contract number on Christine's
   router. The contract was to be mailed to Christine since she was put down
   as the contact. We now have a new sales rep. so I am going through the hoops
   again to get the information we need.
 - This latest round of viruses is hitting everyone pretty hard. Keeping the
   machines up to date with patches and antivirus definitions is really taking
   up a lot of time. So far we have been fortunate and not had any major
   problems here at LIGO CIT.
 - Working on a number of document issues.
 - Setup a number of accounts and checked out a couple of SURF students that
   are returning home. Regular user support has also been a time consuming
   activity this week as well as trying to catch up on things left over from
   last week while on vacation.

From: Catharine Stebbins <stebbins@caltech.edu>

Observatory website redesign:
1. Have contacted Shannon Roddy about transferring Livingston site files.
2. Development of logos/graphic design for both observatories progresses. Expect to have working examples for review in early September.
 


Advanced LIGO Development (Shoemaker)



 

Advanced LIGO and supporting R&D

Core Optics

From: GariLynn Billingsley <Billingsley_G@ligo.caltech.edu>


Scanner.
Mike Gerfen presented a design for the Scanner baseplate which will accommodate large and varying sizes of optics. GariLynn and Liyuan have reviewed the design and given Mike approval to fabricate.  Mike is to respond with an estimated delivery date within the week.

We are setting up a meeting with Physical plant to plan installation of water and power service for the 30W laser which will be installed at the scanner.  Shipment of the laser is promised September 4th.

Downselect
Sapphire homogeneity was measured along the a and m-axis of a single material sample.  A-axis material was found to be significantly more homogeneous than m-axis material. LIGO-T030177-00.


Auxiliary Optics

From: Michael Smith <smith@ligo.caltech.edu>

PHOTON DRIVE R&D
Tom Essinger-Hileman has aligned an optical system with 4 bounces from the MC2 mirror. He presented his SURF talk, and has completed his SURF program.

Aidan Crook is staying an extra week and  will test the photon actuation control of the mode cleaner after it is locked.


Other Laboratory R&D

From: Greg McIvor <gmcivor@ligo.caltech.edu>


Simone:
Ive completed the XRD scan of the MoRuB just splatted. Some samples [b=15,16,18] present an unidentified small crystalline peak around 25 deg in 2theta scale. Bill told measures on samples could be done for it should be less than 1% crystalline. Spent the rest of the week visiting LIGO site inHanford and Seattle.

Hareem:
Consulted Numata-san about the Borlan builder issue and am waiting. Also preparing to leave.

Allyson:
Final week. Finishing hardness measurements.

Charles:
Very short week because of the Hanford trip.  Asked GianlucaGuidi about filtering as he used to work on it, he advised me some papers and books to read about it.  So I tried to understand more deeply what has been done on the signal processing for Gravitational-waves detection.

Francesco:
Me and Charles worked on the stress-strain machine, mainly to understand how we can use the PID to control the heating of the central rod.  The first simulation from ANSYS for the strain energy of the joint reveals that the analytical formula is correct for the joint at rest, but not for the bending. The simulation shows that the strain energy for the ending is linear with mass, my my formula is mass independent, so I have to understand what's wrong. I borrowed from the library two books on elasticity for this purpose. That's all, on thursday I went to Hanford for the LIGO trip.

Greg:
Continuing to prepare samples to test mechanical properties (Youngs modulus, stress-strain). Beginning work on report.

Xavier:
Finished simulations. Starting to work on my report.



For additional information about this report, contact sanders@ligo.caltech.edu