Weekly Report for Week Ending July 6, 2000


 Exec. Comm. Agenda
Highlights
LSC
Administration
Hanford Observatory
Livingston Observatory
MIT
Caltech
Detector
40 Meter
TNI
LASTI
Data Analysis
LIGO II/Adv. R&D
Past Weekly Reports

The LIGO Executive Committee Agenda for Monday  July 10, 2000 will be:

 CANCELLED DUE TO GWIC TRAVEL


Special Announcements:


Weekly Report Highlights
 


LSC Issues (Weiss)


No report this week.


LIGO I Construction/LIGO Laboratory Administration (Lindquist)


WBS 1.2 LIGO Operations--Administration


LIGO Weekly Site Telecon (Lindquist)

There was a brief site telecon held on July 6, 2000. Some of the issues discussed included: The list of current actions revised to reflect open actions assigned through June 22, 2000 may be found at ACTION LIST.


PROPERTY MANAGEMENT (Chargois)

From: Ed Chargois <chargois_e@ligo.caltech.edu>


DOCUMENT CONTROL CENTER (Turner, Mak)

From: the DCC <dcc@ligo.caltech.edu>

Update on Linda Turner:  If things go well, Linda may return to work by sometime next week.  Of course, this is only tentative...

Web pages for the DCC give simple how-to's for document numbering, easy access to the latest on-line documents, and search capabilities for the DCC database. Take a look. . .

From: Cleveland Mak <mak_c@ligo.caltech.edu>

 ACTIVITY HIGHLIGHTS

Press here to access the DOCUMENT CONTROL CENTER WEB PAGE.


COST SCHEDULE CONTROL SYSTEMS (Cunningham, Brambila, Akutagawa, Kaufman)

From: Esther Cunningham <esther@ligo.caltech.edu>


Press here for ACCOUNTS PAYABLE HISTORY DATA.

From: "Brambila, Ruth" <Ruth.Brambila@caltech.edu>

From: Florence Kaufman <fkaufman@ligo.caltech.edu>

SUBCONTRACTS MANAGEMENT (Petrac, Jasnow)

From: irena@ligo.caltech.edu (Irena Petrac)

From: Ed Jasnow <jasnow@ligo.caltech.edu>

  • No report this week (vacation).


  • Support (Wood)

    Rita Torres

    Dorothy Lloyd
    Graph provided by Cindy Akutagawa Irene Baldon

    Please note that this report covers only three days due to the four day Holiday Weekend.

    Elizabeth K. Wood

    Advanced LIGO (Frey, Petrac)

    From: Thomas Frey <tfrey@ligo.caltech.edu>

    Progress Period from from 6.30 to 7.6

    Accomplishments:

    Schedule: 7.7 to 7.13 Anticipated Challenges: Corrective Action: >From: Irena Petrac <irena@ligo.caltech.edu>

    WBS 1.4.1.2   Project Controls (LIGO Construction)

    Reports (Lindquist)

    The first draft of the end-of-May Quarterly Progress Report has been distributed for review and comments.  Some figures are still needed.  "Strawman" budgets for LIGO I Operations and LIGO II Operations have been distributed, and revisions have been received for several second-level tasks.  We have scheduled June 20, 2000 for the task managers to present and defend any increases to their proposed budgets over the current plan, although this will be postponed since neither Gary nor Barry will be available.

    Change Control/Contingency (Lindquist)

    The following change requests have been submitted:
     

    CR-990028 WBS 1.1.3 Beam Tube Enclosure Closeout F. Asiri
    CR-000005 WBS 1.2.1 Upgrade Pre-stabilized Laser S. Whitcomb
    CR-000006 WBS 1.2.1 Re-polish Core Optics Components S. Whitcomb
    CR-000007 WBS 1.2.2 Replacement of Optical Lever Lasers S. Whitcomb
    CR-000008 WBS 1.1.4 Cameras and Projection System at LIGO Livingston Observatory F. Asiri
    CR-000009 WBS 1.1.4 Cameras and Projection System at LIGO Hanford Observatory F Asiri
    CR-000010 WBS 1.2.2 Redesign Suspension Controllers S. Whitcomb
    CR-000011 WBS 1.2.2 VME Development System and Spares S. Whitcomb
    CR-000012 WBS 1.2.2 ASC/LSC Rework S. Whitcomb

    Copies of these change requests have been distributed to memebers of the LIGO Change Control Board (See LIGO-M000176-00-P).

    Press for the latest Contingency Needs Projection.


    COST SCHEDULE CONTROL SYSTEMS (Duncan, Akutagawa)

    From: Kris Duncan <kris@ligo.caltech.edu>

  • From: Cindy Akutagawa <cindy@ligo.caltech.edu>


  • SUBCONTRACTS MANAGEMENT (Petrac, Jasnow)

    Quality/Safety (Tyler)

    >From: Bill Tyler <tyler@ligo.caltech.edu>

     


    LIGO Hanford Observatory (LHO) Operations (Raab)


    No report this week.


    LIGO Livingston Observatory (LLO) Operations (Coles)


    OPTICS/COC INSTALLATION: Beamsplitter and ITM-y have been installed and aligned since last Thursday. ITM-x installation is in progress. (Jonathan Kern)

    PSL: We are replacing all the New Focus mounts with Optosigma ultrastable mounts to reduce acoustic sensitivity on the PSL table. We are currently realigning the reference cavity. (Joe Kovalik)

    Administrative: Review of site expense of past year (7/99 - 6/99) indicate transactions ~ $50K in total have been mis-allocated to Site Support (5L503). Request put in to Caltech Financial Account to do a cost transfer from LIGO.00005-3.8. (Coles, Wascom)
     


    MIT (Shoemaker)


    All items covered elsewhere.


    Caltech (Sanders)


    All items covered elsewhere.


    Detector/Technical Support (Whitcomb, Coyne)



     
     
    Note: The 4th of July holiday, the Marcel Grossman conference and vacations result in this 'thin' report.

    Installation & Commissioning:
    Hanford
    Livingston
    Other Science/Engineering Activities:
    Design/Analysis/Fab
    Issues/Concerns
    See also the Installation web page

    1.1 LHO INSTALLATION & COMMISSIONING

    ISC Commissioning

    LHO Commissioning
    Nergis Mavalvala, Rana Adhikari, Julien Sylvestre, David Ottaway, Mike Landry
    We have installed and aligned ISCT7 and ISCT10. Light from the antisymmetric port is incident on the LSC photodetector and the power-recycled Michelson has been aligned to give fringes. With help/consultation from Rolf Bork, Richard McCarthy and Josh Myers have continued with installation and testing of both the analog and digital control electronics for the LSC system in parallel with interferometer alignment activities. We have also completed installation of the RF distribution system for the 26.7 MHz modulation for locking the mode cleaner. Both the length and alignment controls for the mode cleaner are now fully operational.

    LSC Controls

    Peter Fritschel, Rolf Bork
    We have modified the way the LSC digital controls provides attenuation at the internal mode frequencies of the mirrors. Previously, this was done using steep stopband filters at the aliased drumhead mode frequencies, which were applied to the sensor channels. Instead, we have moved these filters so that they are applied to the individual mirror channels. For the 4 test masses and the recycling mirror, we have also tailored the stopband filter so that it kills both the aliased drumhead mode, and the lower-frequency butterfly mode (around 6.7kHz) which proved to be  bothersome in the one-arm testing. The beamsplitter, being much thinner than the test masses, has resonances at different frequencies; here we've used three notch filters to kill the three lowest frequency modes. The advantage of moving the resonance-killing filters to the mirror basis is that now the lock acquisition code can make use of them too: the control signals computed by the lock acq code will be fed through these filters so these loops won't ring up the internal modes. Rolf has incorporated these changes into the LSC servo code.

    PSL

    Rich Abbott
    Prototype of new pockels cell driver has been tested on the bench with remarkable performance.  The total phase shift at 1 MHz of the output driver stage (PA-85/AD829 composite driver) is now 5 degrees above ideal.  This represents a 50 degree improvement over just a bare PA-85.  Testing will now begin with the laser to see if this produces any useful result.
     

    Input Optics

    Dave Ottaway, Corey Grey, Haisheng Rong (reported by David Reitze)
    The radius of curvature of the curved optics that will be used in the 4K mode cleaner/telescope have been measured. With the exception of MMT3 all of the mirrors are within the specifications. The radius of curvature of MMT3 is 13 cm shorter than specified.  This can be compensated by small adjustment of MMT2 position in the installation.

    1.2 LLO INSTALLATION & COMMISSIONING

    Core Optics Installation

    Peter Saulson, Joe Kavolik, et. al.
    Last week saw the end of the first intensive period of commissioning at LLO. Commissioning now takes a back seat to installation, until 25 July.

    COS Assembly

    Ken Mailand, Lee Cardenas
    All of the assemblies have been completed now. All the steering mirrors 2" 45deg, S and P polarization (16) total are in the bake,  along with (1) of the 2" , 0 deg mirror.

    ASC

    Jay Heefner
    8 WFS demod boards are in test and should be shipped by 7/14. All other boards are being fab'd or have been shipped.

    LSC

    Dale Ouimette, Flavio Nocera, Mohana Mageswaran
    We have started production of the next set of LSC boards for LLO. Flavio beginning testing of the timing system components.

    2.0 Other Engineering and Scientific Activities

    2.1 Design/Analysis/Fab

    PSL

    Lee Cardenas, Rich Abbott
    Continued preparation of the new Turbo molecular pumping station for the Ref. Cavity Chamber at the PSL Lab.
    Re-started the Laser, checked all its parameters and locked the laser PMC.
    Began receiving ordered parts for next PSLs

    Photon Calibrator

    Matt Smith
    Finishing up the design for the support table for the photon calibrator.  Will send out for quote this week.  Continue to work on the design of the photon calibrator assembly, piece parts, and enclosure.

    ISC & IOT Tables

    Matt Smith
    Met with Peter Fritschel last week and went over the ISC and IOT tables for the 4K interferometers.  He has some minor changes that I will incorporate and submit for release.

    Suspension Eletronics Re-design

    Jay Heefner
    Drafts of the digital LOS and SOS design documents have been circulated for comment. Jay will incorporate the comments into the documents and release it to a more general audience. The design for the various pieces of the systems has been started and we should have some hardware and software in place by late summer or early fall.

    We are currently looking at two different designs for the AC OSEMS. The first is the suppressed carrier proposed and tested by Rai Weiss. The other is an amplitude stabilzed oscillator design. We are still trying to have a few in place by late summer.
     

    COC Metrology

    GariLynn Billingsley, Michael Hrynevych
    Measurements of ETM01 are finished, ETM02 is installed in the test set and is ready for measurement.  Temperatures in the Lab went out of control over the long weekend, so we're not finished tweaking yet.

    GDS

    John Zweizig
    This week I have modified the designer dataset writer to use Keith's operating state condition class to trigger on interesting data segments. I have also installed the new version of root (v2.25, a major version change) on the Hanford DMT machines and have modified the DMT code to be compatible with this new version. Also, much consulting and debugging.

    2.2 Issues Concerns

    no new issues


    40 Meter Interferometer (Weinstein)


    No report this week.


    Thermal Noise Interferometer (Libbrecht)


    Not much to report this week due to the Independence Day holiday.  Having
    gotten the test cavity in our photothermal noise experiment to resonate we
    have been looking for noise sources.  We found some noise in the mirror
    clamps in the test cavity and are in the process of replacing them with a
    new design.  We also ordered some new mounts for the input optics on that
    experiment, again to reduce mechanical noise and make alignment easier.


    LASTI (Zucker)


    No report this week.


    Data Analysis and Computing (Lazzarini)



     
     

    Simulation and Modeling


    Biplab worked with Brad Zamft (Rick's summer stundent) working on the
    shotnoise calculation of the reference cavity. The e2e generated half
    the
    amount of shotnoise compared to the value calculated by E. Black, but
    further discussion among Biplab, Hiro and Eric resolved the discrepancy
    and the e2e prediction turned out to be correct. Now, the complication
    caused by the higher order mode is being investigated.

    Luca studied the effect of the misalignment on the locked Michelson
    system.
    He is going to work with Matt to study the real impact of the effect on
    the
    stability of the lock and is going to estimate the accuracy of the
    prediction.

    Hiro kept working on the parser/runtime-compiler. Now local functions
    can
    be included in the formula.

    G.Cella sent us a data file of the mirror motion of the reference
    cavity.
    This is the convolution of the measured motion of the PSL table top and
    the MSE simulation of the reference cavity. With the up coming e2e
    module to generate mirror motion based on the data file, the effect of
    the table motion on the optical signal will be simulated to study the
    PSL noise.

    Ed completed the make environment of MSE.

    Bruce kept working on cleaning up the alfi code.
     
     

    LIGO Data Analysis System

    Software:
    A new disk storage system was added to the Hanford dataserver and
    caused the system to fail to mount the needed file system for the
    group to have secure logging facilities. We were unable to complete
    the tests of the new LDAS system over the weekend as a result of
    this hardware upgrade. On Wednesday the problem was fixed and the
    testing of the LDAS system has resumed.

    Test results for ingestion of data using this version of LDAS are
    consistent with older tests.

    Test results for translation of frames into ilwd objects are also
    consistent with older tests.

    Test of the transmission of ilwd objects through sockets are not
    yet complete. However, preliminary results are showing slightly
    higher results. These results are slightly higher than is to be
    expected from 100bT ethernet and testers are reviewing code to
    see if a rate computational error can account for the roughly 15%
    higher than expected results.

    A new socket communication timeout problem showed up on the Hanford
    system between the controlmon(Intel) and dataserver(Sun). It is not
    clear yet if this is isolated to these two boxes or exists between
    any pair of Intel and Sun. Test are under way to determine if it is
    software or hardware related.

    The Guild user interface has new TCL/TK functionality to support a
    request for a list of available channels in frames.

    The framebuilder is being upgraded to write out version 4 frames. This
    will be very important for testing LDAS's version 4 frame functionality.

    The dataConditionAPI group meet and discussed readiness for the Mock
    Data Challenge at the end of the month. The largest remaining obsticles
    are the completion of the command chain interpreter in the C++ layer and
    the development of the TCL layer for the API. The TCL layer will require
    the most work to have ready for the MDC.

    The new release of LDAS is being delayed until more information about the
    ilwd socket transmission tests are available. The results of these tests
    should be available by the end of this week.

    Hardware:
     

    >From Greg,

    1)  The shelving for the beowulf cluster at LHO has been sorted out.
    The necessary pieces to build a least 3 shelving units (4 shelves per
    unit) are here, or are being sent here from Livingston.

    2)  The Sun D1000 288 GB disk unit was incorrectly installed on the ldas-wa
    dataserver on June 30 and will be re-installed shortly.

    3) Upgrades of the OS to RedHat Linux 6.2 on the ldas-wa linux boxes has
    begun.

    4) The moving of the cds racks across the mass storage room to make way
    for the beowulf shelves has begun today (7/6/00).
     

    >From Omar,

    1) Upgrading beowulf server and nodes to redhat 6.2

    2) Moving system critical software to local disks from nfs to improve overall
    stability.

    3) Continuing work on ups shutdown.
     

    General Computing


    MIT:
    Working on getting the new computer room arranged to handle future installs.

    Hanford:
    Installed the latest version of gcc compilers on the license server.
    Worked on several procurement issues for new software and hardware.
    Provided Sys. Admin. support for the many summer students and visitors.

    Livingston:
    Working on getting the FORE equipment s/w upgraded.
    Finally, received some quotes from Bellsouth concerning upgrading the network
    connection to a higher data rate. We've asked them to also give us a cost
    estimate for OC3 connection speeds.

    CIT:
    (Barbara)
    - Added features to the CostBook web forms for Capital Projects.  Added
    Location field to Equipment forms. Made a number of changes related to
    hourly rates.
    - Created/installed web page describing Hanford fire from Fred's e-mail and
    photos.
    - Made minor updates to LDAS web site.
    - Made a temporary fix for a problem on the NT DCC server. The s/w will hang
    once in awhile, presently looking for a patch to resolve the issue.

    (Suresh)
    - Installed some application software (Exceed 6.2 and Microsoft Office 97) on
    a new PC to be used by Rick Karwoski. Working on to install ITS site licensed
    sofwares (Matlab, Mathematica etc) over the network.
    - Fixed  system and printing problem in Sun system tiger.
    - Worked on user account and aliases related problem.

    (Samantha)
    Hobbled around until discovered the joys of rolling chairs, almost as good
    as rollarblades, although there is not quite the fine control.
    - Completely rebuilt the computer the operates the DVD and the
    Scanner. The operating system was complete messed up, thus we started at
    the beginning with an FDISK and moved forward from there.  Loaded the
    operating system again, started loading the software, and then ta da, got
    to start over again.
    - Building a test machine to try out a new way of backing up NT
    servers. Currently in the process of making sure everything works with
    the current operating system before it gets annihilated in favor of NT
    SERVER.  Also making sure box is stable to use for future software testing
    - Burned some CDs that have been needing to be burned, configured the software
    that was going on the CD.
    - Randomly decided to visit Eudora web site, discover that Eudora is now
    up to 4.3, as soon as the computer has decided that it has been formatted
    enough times and that it really would like to have an operating system
    installed on it that will refrain from crashing every ten minutes will
    test out the new Eudora 4.3 and see what new and cool features that it
    has.  Hopefully it will make tunneling easier.
    - Started to write up some documentation.  Discovered that through my
    Caltech career I have lost any ability that I might once have had to write
    proper English.  I no longer recall how to structure sentences and worse
    yet I no longer recall how to fully spell out words.  The spelling deficit
    could be overcome if I reverted to the tried and true way of abbreviating
    everything, but concluded that only I would know what the abbreviations
    stood for, thus this would render the documentation useless.

    (Lisa)
    Worked a number of issues at Wilson House. Working on getting more information
    for the modem pool replacement. Putting in more documentation for existing
    processes performed by the Sys. Admin. group. Working on resolving some CADENCE
    licensing issues.

    (Larry)
    Working on getting a few of the items on the large SUN order expedited. Yes, it
    has gone through but most items are not scheduled to ship until August.
    Working on some of the network issues for upgrading the network at Hanford,
    Livingston and CIT.
    Wrapping up items for the 01 General Computing budget plan.
    Ordering a few more items to get the Wilson House network connection moved over
    to single mode fiber all the way from end to end. Presently, there is a
    combination of multi-mode and single mode.
    So far, the testing of the GNATS system for GC problem reporting has hit a few
    bumps but we will continue with it for a few more weeks before deciding if it is
    a useful tool or not, for our purposes.
     


    LIGO II/Advanced R&D (Sanders)


    David Reitze wrote:

     
     LIGO II:
     
     - Worked on LIGO2 concept drawing for Tanner
     
     - Worked on a length sensing and control scheme for LIGO II and conducted
     measurements regarding thermal lenses in TGG crystals.
     
     - LIGO Input Optics Reference Design Study document is online at
     ~tfrey/index.html under L2 Proposal Data link.
     
     

    From: Sam Richman <srichman@ligo.mit.edu>
    MIT two-stage isolation protoype (Sam Richman, Jamie Rollins, Jon How)
     

    We now believe that the substantial tilt coupling seen while driving with horizontal forcers at low frequencies is caused by the anisotropic nature of the blade springs.  If one pulls horizontally on the bottom of the flexure that connects the tip of the blade spring to the suspended stage, the  spring displaces vertically by different amounts depending on which horizontal direction one pulls.  This seems to explain the large tilt effect, and why it is the same size with all three horizontal forcers.
     

    Jon How (MIT aero/astro prof.) has used Jamie's TF measurements to construct state-space models of the system, and we will now try to develop controllers based on these models.
     
     

    _______________________
    SWG telecon and Monthly Progress summaries, Thursday, July 6, 8.30 pacific, one hour

    Agenda:
     

    1) Lab/Organizational issues

    2) Suspensions
    a) suspensions per se
    b) fibers fabrication
    c) fibers noise performance

    3) Test mass materials and integration
    a) coating losses
    b) bulk losses: sapphire, fused silica
    c) bonding, welding

    4) Thermal noise measurement
    a) TNI near-term
    b) plans long-term

    5) Isolation systems
    a) stiff system
    b) soft system

    6) LASTI; coordination of efforts in a general sense
     
     

    =============================================================

    Some notions of significant events in SEI-SUS over the coming years to discuss. These are my interpretations of dates and places; please chime in with changes or misconceptions in our discussion or beforehand.

    - a round of SEI (isolation) prototyping on the HAM design is in planning, to be performed at Stanford; assembly will start in January '01 with testing starting in February '01

    - a vacuum-ready SEI HAM system design will start halfway through the process above, which will arrive at LASTI in Oct
    '01

    - a vacuum-ready SEI BSC (test mass isolation system) will follow, date TBD, ideally ~6 months later

    - the SEIsmic isolation systems will be first tested stand-alone, to determine if the controls are ok and to measure isolation transfer functions and residual optics platform noise (using seismometers)

    - suspension design work to be reviewed in 4q00, with GEO leading the effort

    - prototyping of suspensions is on-going at GEO, with significant interchange LIGO-GEO as LIGO people come up to speed on the design and develop fabrication techniques

    - by 4Q01, we will come to close on many detailed aspects of the suspension design: test mass materials properties, fiber/ribbon choice and fabrication technique, bonding/welding development, characterization of the violin string excitation. The Preliminary Design Review will take place, and the LIGO Lab will start to lead the suspension final design and fabrication work.

    - a few (2 or 3) 'controls' SUS MC (mode-cleaner suspension, steel wires, dummy masses but with a mirror attached) can get to LASTI in October '01, and a 'controls' SUS TM (test mass) quadruple shortly thereafter.

    - then a suspension will be mounted on the SEI system to ensure mechanical fit, and controls compatibility

    - a cavity will be build up of (maybe) one TM suspension on a BSC SEI, and two MC suspensions on a HAM SEI, to test overall controls.

    - sapphire and fused silica are being pursued, with fused silica either a fallback or 'step one' of a staged approach. A choice will be made in early '02, with trial and special-purpose test mass optics fabrication started

    - the TNI will have made tests of sapphire substrates by early '03 to check on the thermoelastic noise model, might be moving on to different spot sizes

    - suspensions with the final test-mass material come to LASTI for characterization and noise testing in 3q03

    - Lastly, there will be 'first article tests' of the first units running off the production lines; this is just months before installation at the observatory starts, and mostly checks installation procedures and fit-checks of the production isolation and suspension units.
     
     

    =============================================================

    GEO/Norna Robertson:

    Glasgow GEO suspensions group - SWG report, July 1 2000

    1) Visit from Andri Gretarsson for a week to discuss losses in fused
    silica, sensors for violin mode damping and experiments to determine
    coating loss. Together we bonded together 3 halved silica rods for bond
    loss measurements to be carried out in Syracuse later in the summer.
    2) During the course of a series of bonding experiments/evaluations we
    discovered that superpolished ears from GO were not bonding to
    superpolished flats from GO, after standard cleaning procedures. This
    situation was rectified by pre-etching the surfaces either with
    concentrated detergent of saturated Ammonium difluoride solution for half
    an hour after which bonding could be carried out as normal. (Geppo Cagnoli
    and Jim Hough) This has been discussed with Phil Willems and Helen
    Armandula at Caltech.
    3) While considering the LIGO II suspension design for the requirements
    document and the conceptual design document we realised that for a fixed
    sapphire mass there is an optimum mirror diameter to minimise the effect of
    thermoelastic damping. For a mass of 30kg Geppo Cagnoli has calculated this
    to be approx. 28.5 cm. If we use 32 cm diameter we must increase the
    thickness and the mass for optimum solution. Thus consideration must be
    given urgently to what mass we should design for LIGO II.
    4) Algor is being used to calculate mode shapes to allow better
    interpretation of the effect of dielectric coatings on the losses at the
    resonant modes of a silica mass (David Crooks and Peter Sneddon).
    5) Algor is also being used for the preliminary modelling of twisted silica
    ribbons (David Crooks)
    6) Calculations on the thermoelastic effect arising from change of modulus
    with temperature are close to a conclusion (Geppo Cagnoli and Phil
    Willems). This has implications for pendulum thermal noise in LIGO II design.
    7) Preliminary quadruple design for a 32 cm sapphire mass has been carried
    out. (Calum Torrie et al).
    Next month
    1) Gregg Harry visits mid-July for two days for further discussions on
    silica losses etc.
    2) Sheila Rowan is bringing back sapphire mass with bonded silica cone for
    loss measurements
    3) Sheila Rowan is also bringing back silicon masses for loss testing.
    4) Work will progress on construction of new fibre and ribbon pulling
    machines.
    5) Further work on overall suspension design, incorporating considerations
    resulting from choice of mass, choice of lower frequency cut-off, and
    effect of new thermoelastic damping calculations.
     

    =========================================================

    Stanford/Sheila Rowan:

    Interim report on LIGO II related work.
     

    (1) In a parallel set of experiments with the Glasgow group a set of polished fused silica rods has been silicate bonded for use in a collaborative experiment with Syracuse on measuring the loss associated with silicate bonding

    (2) A fused silica ear has been bonded to a thin fused silica plate in order to make a low mechanical loss suspension for use in the coating experiment at Syracuse

    (3) Discussions with Phil W. and colleagues in Caltech to assess plans for further bonding studies for both silica/silica and silica/sapphire bonds.
    Some preliminary silicate bonds between one inch diameter silica/sapphire substrates have been made. These will be strength tested at Caltech using a modified version of the strength tester there.

    (4) Work has continued with Kenji Numata of the TAMA project on understanding the finite element modeling of an-isotropic materials  with a visit by him to Stanford on 22nd June.

    (5). A fused silica attachment has been bonded to the sapphire mass described in previous reports, for mechanical loss studies. This is now setting and Q measurements will start in the next few weeks.
     

    Plans for the coming month:

    (1) Attendance at the MG9 meeting in Rome followed by a lab. visit to the
    VIRGO group at the University of Perugia

    (2) Initial Q measurements of the silicate bonded sapphire sample

    (6) Continue with the Q measurements of single crystal silicon samples.
     

    ===========================================

    Caltech/Phil Willems:

    Silicate bonding:
    -----------------
    We have tried to understand the structures seen in silicate bonds and what
    causes them. The easily visible crystals appear to be KOH precipitating in gaps
    within the bond. Fainter, fernlike structures that I call 'rivers' appear to be
    channels by which water escapes from the interior of the bond to the edges.
    Sometimes a diffuse etching is also visible. Sheila Rowan has found that these
    features are largely absent if the substrates are extensively rinsed in DI water
    before bonding. We are also investigating this. We have two of Sheila's most
    recent bonds on loan which we are studying optically to try and measure the
    thickness and refractive index of the bond layer.
    The bonds made at Caltech to compare strength with the bonds made at Stanford
    will be tested today. We are working the kinks out of our fixture to test how
    bonds cure under LIGO II loads. We are also modifying our strength tester to
    break 1" silica/sapphire bonds that Sheila Rowan has provided.
    We have found that silicate bonds that are broken cleanly while still new and
    then cleaned and rebonded are substantially stronger the second time. This may
    be due to the cleaning or due to a preliminary etch of the surfaces by the first
    bond. This seems to corroborate the finding in Glasgow that etching off the
    superpolish can make the difference between bonding and not bonding.
    Fused silica fibers/ribbons:
    ----------------------------
    The calculations of the nonlinear thermoelastic damping are essentially done and
    the paper is being written up. Published values for materials parameters of
    fused silica indicate that the optimum thermal noise is achieved at 250 MPa
    static stress, not including surface effects.
    The strength of our fused silica ribbons is not satisfactory for LIGO II. The
    strength values average around 400 MPa in direct tension. Bending tests show
    strength values around 3 GPa, so the glass itself seems to be good- the problem
    could be isolated flaws or details of the tension test or something else. We
    have tried chemical etching and flame polishing without much effect.
    I am still investigating CO2 laser welding as a technology for LIGO II.

    ============================================

    Syracuse University/Peter Saulson:

    Syracuse group's monthly progress report to SWG
    submitted by Peter Saulson
    4 July 2000
    1. Q of fused silica rods
    We are far along in the drafting stage of a paper on the observation
    of Q of up to 57 million in a 3 mm rod of Suprasil 2. It will be shared
    with SWG shortly, and submitted to LSC review.
    A big unknown is the relative importance of the remaining surface
    losses. Astonishingly, the Q for this sample falls almost on the line
    of Q vs. diameter for the smaller samples measured by Gretarsson and
    Harry 1999. A naive attempt to subtract out surface losses by taking
    seriously the old surface loss model would imply bulk loss of Suprasil 2
    well below 1e-8. We don't really believe this -- an equally likely
    possibility is that the surface losses in this sample were made very
    small by the flame polishing. The Glasgow group has seen substantially
    lower surface losses than we had previously, adding to the plausibility
    of this alternative interpretation.
    We are getting ready for measurements of Q vs. temperature. This
    is interesting because Boris Lunin (Moscow State Chemistry Dept.) has
    seen a Q peak around 105 degrees C. His samples showed Q = 30 million
    at room temperature, 50 million at the peak. His measurements were made
    at 8.4 kHz, in the 1st longitudinal mode of bars. He and we have
    corresponded about the likelihood of our seeing higher Q at 100 C vs the
    alternative hypothesis that our Q peak is really at room temperature, due
    to some structural difference between his glass samples (4 different
    kinds) and ours. (Our measurements are also at substantially lower
    frequencies, below 1 kHz up to a few kHz.)
    2. Anelastic effect in fused silica
    We can now reliably subtract out the spurious signal at the rigid
    body mode frequencies, the main new systematic effect coming from
    suspending our sample.
    Steve Penn is now checking his fitting routine by using it to analyze
    fake data that he has generated, containing not only signal and Gaussian
    noise but all of the awkward stuff that we also see. So far his code
    is passing almost all tests (it gives the right value for phi in
    every case, so far), but there is still a bit of uncertainty about whether
    errors are being estimated correctly in all cases. This is important
    because our biggest present worry about the experiment is scatter between
    measurements that don't appear to come from our Gaussian noise.
    We are about to try a data run in vacuum, to see if it makes any
    difference. It would be surprising if it changed phi, but might make
    a difference in thermal drift of fixed birefringence.
    3. Mechanical dissipation in coatings
    Gregg Harry shipped our large silica sample to REO for coating.
    N.B.: REO has recently been very accomodating.
    Thinner samples are being prepared for measurements. Sheila Rowan has
    bonded an ear on one sample. (Thanks!) A second sample will have a post
    welded on it by Syracuse glass blower John Chabot, just in case it will
    work OK.
    4. Violin mode monitor
    Andri Gretarsson has just returned from a pleasant and very useful trip
    to Glasgow. He discussed this experiment there, and received a special
    expression of interest (and offer of help) from Geppo Cagnoli. Andri
    learned of a clever Glasgow idea for using a rotatable glass block to
    allow the laser beam to track the motions of the fiber while staying
    fixed on the output photodiode. We will have some telephone discussions
    soon between Syracuse and Glasgow, to work out the details of cooperation.
    Andri is now testing a new quieter laser, to reduce excess laser
    noise. The biggest technological challenge on the horizon will be
    adding vibration isolation to his setup, so that violin modes are
    excited by thermal noise only.
    5. Miscellaneous work
    Scott Kittelberger is building up his expertise with Algor. His
    current test problem is to model the distribution of strain in the
    cylinder-on-cylinder geometry we use now for our anelastic aftereffectmeasurements.

    =====================================

    Penn State/Gabriela Gonzalez:

    =================================================

    TNI/Eric Black

    Having successfully locked our mode cleaner, we are now preparing our test
    cavities for installation. This month we have been designing
    lock-acquisition servos and assembling hardware, as well as looking into a
    second set of mirrors to allow us to study noise in cavities with different
    finesses.
    We have also been considering the feasibility of smaller-scale experiments
    (smaller than the TNI, that is) to measure excess noise in seismic
    isolation systems and some of the new noise sources Prof. Braginsky has
    predicted.
     

    ==========================================

    Caltech/Riccardo Desalvo:

    ==================================================================

    JILA/Tuck Stebbins:

    May Progress Report: During the past month, we have worked on constructing a
    test rig to evaluate cross-coupling in the electromagnetic forcers used in
    the two stage active isolation system. In the process of fabricating the
    test rig, we developed and tested a new design for a non-contacting imaging
    position sensor which would meet the design requirements of an active LIGO
    II isolation system. The test rig is nearly complete. We have also
    supported the control system work at MIT on the two stage active prototype
    that we delivered in March.
    June Plan: In the next month, we anticipate finishing the fabrication of the
    forcer test rig and the evaluation of the forcers. We will continue to
    support control system development on the prototype at MIT. We expect to
    begin project planning and early design work on the next generation of
    prototypes.

    ============================================================

    Stanford/Brian Lantz:
     

    ==============================================================

    LSU/Joe Giaime:

    LSU:
    Excess noise test facility: Data acquisition computer and various other instrumentation received and being initially assembled. Quiet granite table under test. (M. Kingham, Dan Busby)
    microseism feed-forward:doing calculations on sensor noise and setting up to test Guralp on temperature-instrumented block (Y Yamada, summer surf student)
    seismometer test report generated. (W. Johnson): http://sam.phys.lsu.edu/johnson/SeiFeb2000/LivingstonLSCfinal.pdf
    LIGO-II SEI team work plan and budgeting (J. Giaime)
     

    ====================================================================

    MIT/Sam Richman:

    (Sam Richman for Jamie Rollins, Shourov Chatterji, Jon How, Joe Giaime)
    Shourov has finished constructing 12 channels of forcer current drivers, and has verified their basic operation. The power transistors were getting too hot at high inputs, so he is making a better cooling scheme and will operate at a lower supply voltage. Jamie is setting up the two Siglab units on loan from the West coast; these will be used for measuring multiple TFs simultaneously.
    Jamie completed a set of open-loop transfer function measurements from forcers to various sensors on the upper stage, and has Jon used these measurements to construct state-space models of the system. We now have a better handle on one significant effect: when driving a horizontal forcer at very low frequencies, the stage tilts by an amount only 16 dB less than if it were driven by a *vertical* forcer. We now have a good working hypothesis to explain this effect. The anistropic behavior of the blade springs, coupled with the fact that our flexures are mounted vertically offset from the blade tips by a significant amount, causes a coupling to tilt when the stage moves horizontally. Applying a 15% correction with the nearby vertical forcer reduces this tilt by more than an order of magnitude at 0.1 Hz. This has allowed us for the first time to close a horizontal loop using a broadband seismometer. The seismometer signal is blended with that from the corresponding position sensor at about 70 mHz.
    Jamie has completed a rig for testing blade springs used in the two-stage prototype. We have found it difficult to get repeatable (better than 7-8%) measurements of the spring rate, possibly due to imperfect clamping. The frequencies and Qs of the parasitic modes are being measured. For the smaller blade, the lowest-lying parasitic mode is at about 200 Hz.
    In the next month, we will largely focus on developing and testing controllers using the models Jon has constructed.
     

    ============================================

    MIT/Mike Zucker:

    Vacuum/infrastructure: Continued monitoring of vacuum performance.
    Ordered special high-flow hydrocarbon absorber, desiccant and HEPA
    filter modules for air backfill. Ordered process control relay card
    for Granville gauge controller to implement additional layer of
    failsafe on turbo gate valve.

    Planning:
    1) Worked with the suspension and seismic isolation groups to find the best way to stage the testing at LASTI. Looks like a HAM seismic isolation test, followed by Mode-cleaner suspension testing, is the way to start. BSC seismic isolation follows, with a test of a Test-Mass suspension. The simplest controls and moderate-sensitivity performance test would be performed in a triangular cavity, with one test-mass suspension (on a BSC isolation system) and two mode-cleaner suspensions (on a HAM isolation system).

    2) Looked at common ground with the Caltech 40m interferometer improvements to reduce the proliferation of designs. We hope to have nearly identical pre-stabilized 10-watt LIGO I-style lasers, suspended steering mirrors, data acquisition, diagnostics, and controls systems.

    3) Continued to weigh advantages and disadvantages of further testing at LASTI of a LIGO II laser and/or Mode Cleaner. No conclusions.
     
     

    Mark Beilby/Penn State:
     

    SWG Progress Report, 7/3/2000
    Tuning the excitation stage, Aran Glancy (REU student), Mark Beilby (Post
    doc), Jerod Caligiuri (undergraduate student):
    Our excitation stage (for exciting the top mount of our pendulum in a
    controlled manner) is now fully operable in all 3-axes. This stage was
    initially unable to move to our specs of 10 microns up to 100 Hz in the 2
    horizontal axes (vertically this spec was met). It was discovered that a
    spacer (inserted by the manufacturer and covered with black shrink wrap)
    between the driving PZT and a ball bearing, which makes contact to the
    surface to be moved, was causing the ball bearing not to touch the end of
    the PZT. After this spacer was removed on all PZTs that had it (the
    vertical PZTs had no spacer and ball bearing), the stage now moves to spec
    in the horizontal directions. The stage currently has resonances, which
    start at about 15 Hz. Stiffening the components and reducing the mass of
    the stage are now being investigated, so as to push the lowest resonances
    above about 100 Hz, which is the approximate frequency up to which we
    would like to make measurements on our pendulum.
    Tuning the electronic mirror controllers, Amber Stuver (graduate student),
    Gabriela Gonzalez, Glancy:
    Tuning of the OEMS controllers, which we have from the MIT PNI, is now
    completed. Damping of the pendulum in all six degrees of freedom has been
    obtained. Preliminary measurements of the pendulum transfer functions
    have now begun, while improvements are also being made to the excitation
    stage as mentioned above.
    Modeling the suspension system, Sean McReynolds (graduate student),
    Gonzalez, Beilby:
    A Maple model has been completed which gives the transfer functions in all
    six degrees of freedom for a single pendulum hanging by 2 wires from
    cantilever blades and perfectly aligned. The mode frequencies obtained
    match a previous Matlab model by Gonzalez, along with the measured mode
    frequencies of our pendulum. Work has begun to include misalignments in
    the model, so a prediction can be made for cross-couplings.
    Data Acquisition System, Caligiuri, Gonzalez:
    Work is continuing on writing software for an improved data acquisition
    system. In particular, the DAQ is being setup, so that the computer can
    be used as spectrum analyzer in a sine swept mode for up to eight
    channels.
    Research in better position sensors: Matthew Knee (REU student), Beilby:
    Tests are being conducted using many different types of LEDs in a position
    sensor similar to that was used in the MIT PNI, a fin with a slit between
    an LED and a split-photodiode. Initial tests are studying the sensitivity
    of the sensor to motions perpendicular to the most sensitive direction as
    a function of the beam pattern of the LED. Initial results are
    encouraging; our best results show the calibration of the sensor vs.
    distance perpendicular the sensitive direction does not change by more
    than 2% per mm. These results have been obtained for unlensed or nearly
    omni-directional LEDs. The change in calibration vs. distance
    perpendicular the sensitive direction is much worse for lensed or more
    beamed LEDs, and the curves of position vs. photodiode difference current
    are not even linear in some cases. These results improve over a past
    preliminary test on one OESM from the MIT PNI whose calibration of the
    sensor vs. distance perpendicular the sensitive direction changes by about
    10% per mm. Next, work will begin on comparing this split-photodiode
    sensor to a single photodiode shadow sensor.
    Characterizing the seismic environment: Eric Rossi (REU undergraduate),
    Gonzalez:
    Work is continuing on characterizing the seismic environment and obtaining
    a good baseline for the seismic noise. In addition, the seismic noise is
    being studied as a function of time of day and weekday vs. weekend.
    Comparing different controller topologies:
    The electronic shop in the Physics Dept. at Penn State is nearly done with
    the electronics to control the pendulum via point-to-point.
     

    ===================================================================
     
     

    Brian Lantz/Stanford:
     

    We have been working through the design, cost, and schedule of putting the
    HAM reference design into the ETF.
    We have adding the tilt-horizontal coupling of the horizontal inertial
    sensors to the model, and are now using that to try and diagnose some
    interesting effects of the double active stage at MIT. That model
    functionality will then be used optimize the design of the ETF prototype
    (with direct carry-over to the reference design).
    The work on the hydraulics continues. We have been measuring various
    parameters of the actuator, such as the hydraulic resistances of the
    various valves and flow restrictions, and calibration of the holding force
    of the actuator. We are in the process of adding both passive filtering and
    active pressure control to the pump.
     

    =============================
     

    Virginio Sannibale: Caltech/SAS
     

    July 5th ,2000
    Caltech SAS Seismic Group Short Report.
    1- New MGASF: Tuned the 1.5 mm MGASF filter at 220 mHz. Measured the transfer
    function with 1.5mm thick blades. Measurement done between filter body and
    the payload gives 53dB of attenuation a@ 10Hz internal modes frequencies of
    blades are lower than the 2mm blades (49 Hz, 206 Hz, 440 Hz) as expected.
    Thermal drift of the working point has been measured more accurately using
    just the day night temperature excursion. With a filter tuned at 230mHz we
    got 1mm/K. Increasing the vertical mode frequency the dz/dT decrease
    roughly linearly. A frequency tuning not around the minimum of the
    frequency versus working point graph, can significantly reduce the
    dependency on the temperature.
    Filter body internal modes frequency has been characterized also. The
    spectral mode content starts at about 220Hz.
    2- Creep Blade Facility almost at the last stage of the installation.
    Temperature stability over one day test completed, with reasonable
    result (fluctuation of about +-100mK). DAQ systems under test, Position
    sensor with ~10nm/sqrt(Hz) sensitivity below 1 Hz under calibration.
    Improved the driver electronic noise by a factor 2 and improving the
    position sensor geometry, an overall factor 10 could be achieved.
    3- IP Threshold feedback and Fine Alignment Actuators (stepping motors): 2channel driver
    prototype successfully tested. Communication between the DSP via VME dedicated
    board to the driver will be start soon. Some solution to decrease
    the stepping motor noise are under evaluation.
    4- Simulation : Program to determine MGASF blade shape analytically to make the
    stress uniform, under test. MGASF simulation to predict the thermal behavior
    under first test also.
    5- Accelerometer : second prototype of the folded pendulum accelerometer is
    under manufacturing First prototype of the PCB of accelerometer driver is
    already available.
    Vertical accelerometer design based on the MGASF is under evaluation.
    6- Control: optimization of the diagonalization procedure for the position
    sensor of the IP. Study of the effect of the thermal drift in the
    diagonalizaltion procedure. Found problems on measuring the transfer
    function with IP tuned below 30mHz probably due to the noise source
    generator.
    -7 Small IP prototype: started the characterization of the small inverted
    pendulum prototype internal mode stability working point etc. Oil
    bearing IP shaker, under test.
     
     


    For additional information about this report, contact sanders@ligo.caltech.edu