Bake Lab Jobs

for

Ken Mason

 

March

1. Feedthroughs for LASTI

a. Travelers

1. First shippment too MIT feedthroughs

b. Certifications

1. 25D2-450 feedthroughs

2. Leak Test 3pin power feedthrough

3. Leak Test 25pin feedthroughs Serial No.. 1. . . 2. . . 3. . . 4. . . 5. . . 6. . . . 7. . . . 8. . . . 9. . . . 10. . . . 11. . . . 12

Leak Test Calibration

a. Drawings

1. 25 Pin 450CF feedthroughs

2. 3 pin power feedthroughs

3. 16.5 inch Multiport Conflats Vacuum side

4. 16.5 inch Multiport Conflats Air side

c. Packing lists & Shippments

1. First Shippment

2. MCE Packing List

 

d. Scan Data

1. Analog

a. F3507_KM 16.5 Multiport conflats ( These are the replacements for the feed-throughs that leaked)

b. C3507_KM 4.50 Feedthroughs ( These attach too the 16.5 Multiport Conflats)

c. F32607_KM 4.50 Feedthroughs ( second batch shipped)

2. Calibrations

a. F3507_KM_cal 16.5 Multiport Conflats

b. C3507_KM_cal 4.50 feed-throughs

c. F32707_KM 4.50 Feedthroughs ( second batch shipped)

3. Calculations

a. F3507_KM_calc 16.5 Multiport Conflats

b. C3507_KM_calc 4.50 Feed-throughs

c. F32707_KM 4.50 Feedthroughs ( second batch shipped)

4. FTIR TEST FOR LARGE PARTS ISI BSC