Simulation of Pre-Stabilised Laser (PSL)
-Full architecture completed with all connected ports
-ISS (Intensity Stabilization) loop working well
Making a list of validation runs
and filling up PSL parameter Table
(Rick; By 06/05/99, LHO)
Test of individual boxes: MOPA, FSS, PMC, ISS.
Full shake-down of PSL box.
(Biplab, Rick 6/7-6/18/99, LHO; Hiro, Rick 6/21 - 6/24, LHO)
Viewgraphs of
Rick Savage's talk in E2E meeting, May 17-18 at Caltech
End to End
<e2e@ligo.caltech.edu>
Last modified: Tue May 25 15:25:35 PDT 1999