17TH FEB 2005: CONTINUING THE QUAD BUILDING
Feb 17th 2005: Cantilever Blades, Top mass, UI Mass
During his visit form University of GLasgow Mike Perreur-Lloyd and
Calum Torrie
assembled the top and upper intermediate mass. With 'dummy' and real
cantilever blades
| |
||
| Blade and blade
clamps in a mass |
||