Most current cost documents for Adv. LIGO.
Link to Adv. LIGO Cost Book on the Web
List Of Documents Description Date Adv. LIGO Estimate Reports Estimate Status Bubble Chart showing status of Estimate - 1 page 03.21.03 Advanced LIGO Estimating Plan - 9 pages
05.23.03
Sheet that defines risk factors - 1 page 05.23.03 Detailed Estimate Report All detailed cost sheets - 816 pages 01.31.03 Detailed Estimate Report with WBS Dict. All detailed cost sheets with WBS Dict. integrated - 1246 pages 01.31.03 Complete WBS listing in color - 20 pages 05.22.03 Adv. LIGO Estimate Analysis PowerPoint slides used during meeting of August 16, 2002. 08.20.02 Cost Analysis Excel Spreadsheet used to generate slides for August meeting. 08.16.02 Adv. LIGO Summary Report Estimate Summary by WBS - 126 pages 03.25.03 Estimate Summary by Sub System - 1 page 03.25.03 Estimate by Year by Subsytem by Collaborator - 3 Pages 05.23.03 Adv. LIGO Schedule Reports Key schedule dates for the Adv. LIGO Program - 8 pages 05.22.03 Schedule summary by Sub System - 1 page 05.23.03 Schedule Summary by IFO by Sub System - 2 pages 05.23.03 Adv. LIGO Subsystem Reports FAC Detail Estimate Sheets All detailed cost sheets for FAC - 9 pages FAC Baseline Plan - 1 page
Cost Estimate 02.13.03 Schedule 05.23.03
SEI Detail Estimate Sheets All detailed cost sheets for SEI - 97 pages SEI Baseline Plan - 19 pages
Cost Estimate 02.04.03 Schedule 05.23.03
SUS Detail Estimate Sheets All detailed cost sheets for SUS - 154 pages SUS Baseline Plan - 18 pages
Cost Estimate 02.13.03 Schedule 05.23.03
PSL Detail Estimate Sheets All detailed cost sheets for PSL - 56 pages PSL Baseline Plan - 4 pages
Cost Estimate 12.13.02 Schedule 05.23.03
IO Detail Estimate Sheets All detailed cost sheets for IO - 60 pages IO Baseline Plan - 6 pages
Cost Estimate 12.13.02 Schedule 05.23.03
COC Detail Estimate Sheets All detailed cost sheets for COC - 41 pages COC Baseline Plan - 6 pages
Cost Estimate 02.12.03 Schedule 05.23.03
AOS Detail Estimate Sheets All detailed cost sheets for AOS - 125 pages AOS Baseline Plan - 13 pages
Cost Estimate 02.13.03 Schedule 05.23.03
ISC Detail Estimate Sheets All detailed cost sheets for ISC - 142 pages ISC Baseline Plan - 21 pages
Cost Estimate 02.13.03 Schedule 05.23.03
DAQ Detail Estimate Sheets All detailed cost sheets for DAQ - 35 pages DAQ Baseline Plan - 2 pages
Cost Estimate 04.15.03 Schedule 05.23.03
Support Equip Detail Estimate Sheets All detailed cost sheets for Support Equip - 1 page Support Equip Baseline Plan - 1 page
Cost Estimate 05.12.03 Schedule 05.23.03
LDAS Detail Estimate Sheets All detailed cost sheets for LDAS - 33 pages LDAS Baseline Plan - 2 pages
Cost Estimate 04.15.03 Schedule 05.23.03
All detailed cost sheets for Installation - 32 pages. Installation Baseline Schedule - 3 pages
Cost Estimate 02.13.03 Schedule 05.23.03
All detailed cost sheets for PM - 22 pages. PM Baseline Schedule - 2 pages
Cost Estimate 02.14.03 Schedule 05.23.03
Adv. LIGO Collaborators LZH Cost Summary
Estimate summary for LZH scope - 6 pages 05.21.03 LZH Detail Estimate Sheets
All detailed cost sheets for LZH scope - 59 pages 05.21.03 Peter King's Notes on LZH Scope Notes provided by Peter King and basis for LZH scope assignment. 08.13.02 GEO Cost Summary Estimate summary for GEO scope - 17 pages 06.23.02 GEO Cost Detail Estimate detail for GEO scope - 52 pages 06.26.02 UG Cost Detail University of Glasgow estimate detail - 21 pages 06.26.02 UB Cost Detail University of Birmingham estimate detail - 23 pages 06.26.02 RAL Cost Detail Rutherford estimate detail - 22 pages 06.26.02 GEO Schedule Schedule for GEO Scope - 8 pages 06.26.02 GEO Profiles Spreadsheet used to generate GEO escalated profile 06.24.02 Adv. LIGO Subsystem Meeting Minutes M010202-01-A COC Meeting Minutes - 1 page 05.09.02 M020434-00-A PSL Meeting Minutes - 1 page 12.13.02 M010231-01-A AOS Meeting Minutes - 1 page 05.13.02 M010232-02-A IO Meeting Minutes - 1 page 05.13.02 M020433-00-A SUS Meeting Minutes - 2 pages 12.13.02 M010272-01-A SEI Meeting Minutes - 1 page 05.10.02