SUSPENSION
WORKSHOP I
October 13th - 17th 2003
*NEW SCHEDULE* + CONTACT + SUS PAGE + DAYLINKS + DOCUMENTS + *NEW* PICTURES OF WORKSHOP
THE SUSPENSION WORKSHOP IS SCHEDULED TO RUN FROM THE 13th - 17th
OCTOBER
2O03.
THE ASSEMBLY AND ALIGNMENT PORTION WILL START ON TUESDAY THE 14th
OCTOBER
at 8:00am.
Schedule: -
A Draft Schedule is available at the above link. a more detailed one will be available on Septeember 16th, at the above link.
Links to Documents: -
A. TALKS
1) HAM
Overview
- One Possible method of Assembly for the Advanced LIGO Mode Cleaner
Controls
Prototype
Triple Pendum Suspension - LSC Meeting, August 18th - 21st, Hannover,
Germany.
2) Introduction to suspensions, Norna Robertson and Calum Torrie
4) Talk by Dennis Coyne on Organisation, G030536-01
5) Interaction with RAL, email
from Thursday 9th October 2003 from Calum Torrie to aligo_sus
B. DRAWINGS and ASSEMBLIES
1) Summary of assemblies: -
C. RELATED DOCUMENTSD020700 ASSEMBLY MODE CLEANER SUSPENSION2) SolidWorks tools and customised documents (all are avaliable at the DCC)
D020700 (E-drawing, .htm open with Internet Explorer 5.5 or higher)
Has a complete list of all of the suspension parts and an assembly that can be used highlight, move or measure a part
D020661 ASSEMBLY MAGNET AND DUMBBELLD020541 ASSEMBLY LOWER AND INTERMEDIATE MASS
D020316 ASSEMBLY LOWER WIRE CLAMP
D020319 ASSEMBLY UPPER BLADE WIRE CLAMP,
D020319D020535 ASSEMBLY UPPER MASS + TABLE CLOTH
D020225 ASSEMBLY COIL FORMER AND ASSOCIATED PARTS
D020225-09 (includes anodised aluminium head with shoulders and spacers)D030105 ASSEMBLY COIL FORMER HEAD
D020188 COIL FORMER
D020188-09 (includes imbedded .SAT file of the head)D020534 ASSEMBLY UPPER MASS
D020318 ASSEMBLY LOWER BLADE WIRE CLAMP
D020499 ASSEMBLY UPPER WIRE CLAMP (WITH PITCH ADJUSTMENT)
D020532 ASSEMBLY MAGNET AND FLAG (FOR PITCH)
D020533 ASSEMBLY MAGNET AND FLAG
D020542 ASSEMBLY UPPER BLADE GUARD
D020542-02D020660 ASSEMBLY I-BLADE DEFLECTION JIG
D020162 ASSEMBLY LOWER WIRE JIG
D020161 ASSEMBLY UPPER WIRE JIG
D020677 ASSEMBLY LIBRARY OF CLAMPS (INCLUDING CLAMPS FOR THE RA)
D030049 ASSEMBLY INTERMEDIATE WIRE JIG
D020458 ASSEMBLY BASIC ALUM CATCHER INTERMEDIATE & TEST MASS
D030451 ASSEMBLY Rotational Adjuster Assembly
T030143 DESIGNING IN SW
D030384 LIGO BOM
D030382 CUSTOMISED TOOLBOX
D030383 ACTIVE CAD TEMPLATES + DATA TEMPLATES
1) MATCHED MASSES FOR THE MODE CLEANER UPPER MASS
2) CHOOSING A CANTILEVER BLADE FOR THE MODE CLEANER SUSPENSION
D. ETM, RM SCHEDULE (Who's doing what and When)
In anticipation of the Wednesday afternoon session on scheduling during
next week's Caltech workshop please find a
copy of the preliminary schedule/manpower
allocation drafted by Dennis during the July meeting in Caltech.
Subsequent documents that can be considered alongside this are:
Calum's 'personal' workplanner
SUS development plan
http://www.ligo.caltech.edu/docs/M/M000202-A.pdf
Calum I. TorrieJustin's current schedule for WP3 (October 2003)E. OTHER DOCUMENTS
http://www.eng-external.rl.ac.uk/advligo/papers_public/M030161_schedule_WP3/
(both versions found here)
1) MASS ESTIMATE OF AN ETM SUSPENSION, T030137
http://www.ligo.caltech.edu/docs/T/T030137-04.pdf