DIARY FROM APRIL 2003 UP TO APRIL 2006
14th April
2006: Quad
at MIT with the alignment tooling
14th April
2006: More
Quad at MIT
14th April
2006: Quad
at MIT, going into the BSC Chamber
Mark Barton
continues the diary fo Quad photos on his web page
15th October
2005 *UPDATED* RAL VISIT
FOR THE RE-BUILD
10th August
2005 *NEW* In
progress
27th July 2005 3
and 1 assembly continued
15th July 2005 3 and
1 assembly
21st June
2005: Clean Room,
Masses and Testing Wire
20th June
2005:
Visit to
see
face plates for lower structure.
June 2005:
Quad build
continues. Pictures
include Upper Structure, LOS Structure, Clean room and pictures
form
preparation of parts for 3+1 assembly.
May 2005:
Pictures
include the preparation for the 3+1 assembly carried out during vists
from Ian and Norna.
April 2005:
Russell Jones, Tim Hayler and others visited us during
this period of building a triple from a fixed top mass and
stepping through the 3+1 assembly procedure. Pictures
April.
30th March 2005 Pictures
15th March
2005: Pictures
8th March 2005:
Pictures
Feb 2005:
Visit by MPL to assembly the UI and
Top masses. Pictures
Jan 2005:
Electrostatic
(gold pattern), picture on a glass face plate
Feb - Dec
2004 Notes / design effort covered on design page
13th Jan 2004:
Updated with
design of the ETM upper mass and related moments and mass
11th
Dec 2003
: ETM Layout
with 10 different configurations, e-drawing
22nd NOV 2003: UPDATED: -
ETM CP: - Mass Estimate of an ETM suspension layout, T030137-04
9th OCT 2003:
Conceptual
Design Document with updated parameter list, Norna Robertson, T010103-02
10th Sept 2003: *NEW-UPDATED
11th DEC 2003*
ETM Layout with 10 different configurations, e-drawing
5th AUG
2003: ETM Upper
Masses by Mike Perreur Lloyd, with input from Norna A. Robertson
22nd JUL 2003: ETM CP: - Mass
Estimate of an ETM suspension layout, T030137-02
10 JUN 2003: Version 05
-
SoilidWorks
Assembly of the UPPER
MASS, created by MPL, April 30th 2003.
07 MAY 2003: Version
00 -
SoilidWorks
Assembly of the UPPER
MASS, created by MPL, April 30th 2003.
07 MAY 2003: Version
00 -
SoilidWorks
Assembly of the TABLE
CLOTH, created by CIT, May 3rd 2003.
12
MAY 2003: Version 01 -
SoilidWorks
Assembly of the UPPER MASS, created by CIT, May 12th 2003.
MPL has created a plan
view fo the upper mass in order to show the positioning of the
blades
and a .pdf showing an
isometirc view fo the upper mass and mass properties
<>
April 11th 2003: Version 00 - ETM assembly of a
structure with initial assemblies of the upper mass.
http://www.3diw.com/login.asp?u=e17f8f5_ctorrie&f=33551962 -
EXPIRED! OUT OF DATE, SEE BELOW
BLADE TEST FACILITY
13 MAY 2003: Version
00 - A Blade
Testing unit would allow for various work associated with the blade to
be gathered together in
one location. Ideas of what could be included and a drawing can be
found
below: -
1) Draft Version 00: Gathering of Ideas
(May
12th 2003)
2) Draft Version 01:
.jpg of a blade test facility (April 11th 2003)