AL Systems Meetings
|
||||
7 Sep 2005 |
Agenda: 0)
Announcements 1)
Discussion of the SEI HAM prototype efforts
(requirements, SAS exploration) [Joe Giaime] 2)
Stable recycling cavity [Peter Fritschel] 3)
e2e status -- what can be studied now [Hiro Yamamoto] 4)
Gingin status (results from the last oversight
committee meeting) Time permitting: 5)
Update on Optical Layout [Dennis Coyne] 6)
RODA Status [Dennis Coyne] 7)
ICD Status [Dennis Coyne] Note: The following talk: |
|||
28 Jul 2005 |
Next Meeting |
|||
11-13 Jul 2005 |
Held a meeting at Caltech on the following Systems related design issues: HAM isolation requirements
CDS Infrastructure & related topics:
|
|||
9 Jun 2005 |
|
|||
28 Apr 2005 |
|
|||
24 Feb 2005 |
|
|||
10 Feb 2005
|
| |
0) Announcements (Dennis) NSF/OMB budget now shows AL starting with FY08 funding Upcoming Reviews: PSL DRR, 3/24 at LLO SUS update DRR (& MC PDR?),
April '05 COC PDR, ~May '05 1) Action
Item Status (Dennis) 2) RODA
status (Carol & Dennis) 3) SEI/payload coupled dynamics update (Dennis) full
transfer functions (large file!) draft
in-process memo (large file!) 3) recycling mirror dimensions (Mike S.) 4) beamsplitter dimensions (GariLynn) 5) MMT decentering
& diameter (Dave R.) 6) vacuum outgassing update (Dennis) 7) Staging, Assembly and Installation Planning: next
meeting (Dennis) 8) Optical Layout: twomeetings from now (Dennis & Mike
S.) 9) Monthly progress tracking (Carol, All) |
|
24 Nov 2004 |
0) Announcements A call to arms
for a 40m Lab DC readout experiment Output Mode Cleaner for Initial
LIGO Need to analyze
& decide on the size of the beamsplitter 1) RODA
status (Carol & Dennis) M040005-01, a revision to the CP dimensions (in
signature cycle) M040135-03, SUS/UK Scope (precursor to MOU) M040174-00, SUS/UK Scope in Controls Prototype M040279-03, Design work at RAL in parallel with
Controls Proto. (in signature cycle) M040283-01, Sapphire & Fused Silica Baseline
Optic Sizes 2) Update on NSB & NSF AL review
(David S.) 3) COC downselect decision status (David S.) 4) SEI critical design review (David S., Carol, Joe) 5) Request for "End of Construction (MREFC)"
definition from all Subsystem Leaders (Carol) 6) Larger MMT
optic diameter? (Dave R., Dennis) 7) Monthly progress tracking (Carol, All) Note: The discussion on "Staging, Assembly
and Installation Planning: continuation of the 10/14 telecon" has been
deferred to a future meeting. |
|||
Oct 2004 |
cancelled |
|||
23 Sep 2004 |
0) Announcements 1) RODA status (Dennis) 2) Update on NSB/NSF AL review (David S.) 3) COC downselect decision status; date for review (David
S.) 4) Alternative caging structure attachment arrangement
(Dennis, Calum) - sketch of alternative
approaches 5) Synopsis of LASTI re-planning efforts (Carol, David O.) 6) Status/feedback on plans/costs for subsystems for next
fiscal year (Carol, All) |
|||
22 Jul 2004 |
0) Announcements: -
Agenda/topics for the Aug LSC meeting at LHO? 1) RODA status (Dennis C.) 2) Update on NSB/NSF AL review and implications for schedule
(David S.) 3) Plans/costs for subsystems for next fiscal year (Carol,
All – preliminary discussion) 4) COC downselect decision status; date for review (David
S.) 5) Loss in the signal recycling cavity (SURF project work)
(Peter S.) |
|||
24 June 2004 |
0)
Announcements: 1)
Review of recent RODAs 2)
SEI ASI Critical Design Review synopsis (Dennis) 3)
Re-cap of the Mach-Zehnder discussions (Peter or
Alan) 4)
Other discussion or issues? Future topics? |
|||
27 May 2004meeting minutes pending |
0) Announcements - upcoming COC downselect review,
nominally 6/30 (David S.) - SEI ASI design review slipped
to 6/18 (Dennis C.) 1) Review of recent RODAs - MOUs for ACIGA & UK drafted -- format & broader context in review by Stan/Barry 2) Optical Layout update/status (Dennis C.) 3) Optical loss budget of 75 ppm round trip per arm (Peter
F.) 4) Sidebands-on-sidebands issue (Peter F.) 5) Thermally compensated ITM and ETM ROC (Phil W., Mike
S.) 6) Output Mode Cleaner as a short rigid cavity (Peter F.) |
|||
22 Apr 2004 |
0) Announcements 1) Review of recent RODAs 2) coupled SEI/SUS structural dynamics (Dennis) 3) sapphire downselect status/plan (David) 4) OSEM downselect status/plan (Peter) 5) clarification of SEI 1-10 Hz requirement (came up at
the OSEM review) (Peter) 7) brainstorming on implementing a 'lock acquistion
interferometer' (Peter) |
|||
25 Mar 2004 |
Cancelled due to proximity to LSC Meeting, 3/15-18 |
|||
26 Feb 2004 |
0) Announcements systems topics to present or
discuss at the LSC meeting? 1) Beampslitter triple suspension (Norna) see N. Robertson, "Design of
Beamsplitter Suspension for Advanced LIGO, T040027-00 2) Layout update
(Dennis) |
|||
22 Jan 2004Audio Recording
|
22 Jan 20041)
announcements 2) optical
layout update/status including vertical to
horizontal cross-coupling (Dennis C.) 3) proposed revision to the Vacuum outgassing
requirements & implications (Dennis C.) 4) Record
of Decision/Agreement (RODA): (Dennis C.) a) CP in
the ITM chain b) FM &
BS the same dimensions; ROC compensation via coatings c) revised
LASTI experiment plan wrt SUS 6) updates
on the revised
LIGO Lab R&D plan & management of the plan (David S.) 7) Schedule update
M020121-E3 (Dennis C.) |
|||
|
|
|
|||