From ljones@acrux.ligo.caltech.edu Thu May 3 10:52:45 2001 Subject: 40M mechanical items status Here's the current status of parts for assembling the vacuum envelope and isolation stack systems for the mode cleaner addition at the 40M lab (this does not include cable systems, viewports, ConFlat seals, or external bolts): Item Description Status Location 1. Mode Cleaner Chamber: Shell Ready 40M Closures Ready 40M 4 Support Beam Weldments Ready 40M Bottom Plate Ready 40M Top Plate Ready 40M 4 Bellows Ready 40M Cross Beam, 1 Pad Ready 40M Cross Beam, 2 Pad Ready 40M 3 Pad Assemblies Ready 40M Chamber Stand Ready 40M Top Plate for Stand Ready 40M Shims for Stand Legs Note 1 N/A Lower Leg Element Note 2 40M Mid Leg Element Note 2 40M Optical Table Note 2 40M Elastomeric Springs Note 3 40M 12 3/8-16x3.5" SP SHCS Ready 40M 8 1/4-20x2.0" SP SHCS Ready 40M 2. Interconnecting Tube System: 8" OD Tee Note 4 Allied 8" OD Gimbal Ready 40M 2 8" OD Tubesx146.1" Long Ready 40M 8" Adjustable Bellows Ready 40M Zero Length reducer, 8x10 Ready 40M 10" OD Tubex119.32" Long Note 4 Allied 10" OD Tee Note 4 Allied 2 Camera Optics Setups Ready 40M 2 Support Stands Ready 40M Bellows Bracket Note 1 N/A Tube Bracket Note 1 N/A 29" OD Door w/10" Port Note 4 Allied 3. Output Optics Chamber: Shell Ready 40M 29.5" ID Adj. Bellows Note 4 Hyspan* Support Beam Weldment Ready 40M Cross Beam Weldment Ready 40M 7" Isolation Bellows Ready 40M Rear Isolation Bellows Ready 40M 3 Pad Assemblies Ready 40M 3 Lower Beam Clamps Ready In Transit 2 Upper Beam Clamps Ready In Transit 1 Upper Beam Clamp Ready 40M Support Plate Ready 40M 3 Leg Elements Ready 40M 2 Earthquake Stop Nuts Ready 40M 2 Earthquake Stop Bars Ready 40M Top Leg Element Ready 40M Top Plate (Optics Tbl) Ready 40M Mult. Viton Springs Ready 40M 12 5/8-18x2.0" SP SHCS Ready 40M 6 5/8-18x4.0" SP SHCS Ready 40M Viton O-Ring Set Ready 40M 4. Miscellaneous Items: Concrete Anchors Note 1 N/A Insulation Board Note 1 N/A Elastomer Sheet Note 1 N/A Note 1: Speccing and/or design are yet to be completed, as well as procurement/fabrication. Note 2: These items need to be solvent wiped and confirmed clean with a pumpdown/RGA scan. Note 3: These springs are made of silicon. If we can find what had been processed and scanned previously, we'll confirm with a pumpdown/RGA scan. We have many to choose from; at the worst, we'll need to reprocess and confirm clean with a pumpdown/RGA scan. Note 4: To be cleaned and FTIR confirmed at Allied/Alameda. Expected completion and receipt on campus is 11 June. *This item is scheduled to be shipped this week. Confirmation and actual date have not yet been determined. Larry