Document
# - Y |
Date |
Principal
Author |
Sub-system(s) |
Title |
Status |
|
1 |
23 Nov 2004 |
Dennis Coyne |
AOS, SUS |
CP location, dimensions and mass baselined |
signed |
|
|
2 |
23 Jan 2004 |
Dennis Coyne |
COC, SUS |
Same size FM and BS optics |
signed |
|
|
3 |
16 Mar 2004 |
Dennis Coyne |
LASTI, SUS |
Revised LASTI experiment plan regarding SUS |
signed |
|
|
4 |
27 Jan 2004 |
Carol Wilkinson |
COC, SUS, AOS |
Sapphire/fused silica downselect date |
signed |
|
|
5 |
OBSOLETE
superseded by |
16 Mar 2004 |
Dennis Coyne |
SUS/US, SUS/UK, SYS |
OSEM counts and responsibilities for SUS Prototypes |
OBSOLETE |
|
6 |
CANCELED
|
23 Mar 2004 |
Helena Armandula |
COC, IO, SUS |
Covers for AdL Optics |
CANCELED |
|
7 |
30 Mar 2004 |
Norna Robertson |
SUS, SEI, SYS, LASTI |
ETM/ITM quad pendulum structure length |
signed |
|
|
8 |
22 Jul 2004 |
Carol Wilkinson |
SUS/US, SUS/UK, COC/US, COC/UK |
Adv. LIGO SUS/UK Scope (precursor
to MOU) |
signed |
|
|
9 |
OBSOLETE
superseded by: L050025-00.pdf M050196-00.pdf |
22 Apr 2004 |
Carol Wilkinson |
AOS/US, AOS/Aus |
MOU between the |
OBSOLETE
|
|
10 |
20 Jun 2004 |
Peter Fritschel |
ISC, SUS, AOS, SEI |
Output Mode Cleaner to be a monolithic cavity |
signed |
|
|
11 |
28 Jul 2004 |
Carol Wilkinson |
SUS/US, SUS/UK |
SUS/UK Scope in Controls Prototype |
signed |
|
|
12 |
25 Aug 2004 |
Justin Greenhalgh |
SUS/UK, SUS/US |
Design work at RAL in parallel with the quad controls prototype development |
signed |
|
|
13 |
OBSOLETE
superceeded by: M050397 |
8 Sep 2004 |
GariLynn Billingsley |
SUS, COC |
Sapphire and Fused Silica Baseline Optic Sizes |
OBSOLETE
|
|
14 |
OBSOLETE
superceeded by: M050397 |
30 Nov 2004 |
GariLynn Billingsley |
COC, SUS |
Baseline Recycling Mirror Dimensions |
OBSOLETE
|
|
15 |
OBSOLETE
superseded by: section 1.1.6.1.1 “Alignment Reference Features” of the ICD: SUS/UK – AOS, E050169-01 |
19 May 2005 |
Ken Mason |
AOS/IAS, SUS |
Requirement for SUS Features to Aid in Initial Alignment |
OBSOLETE
|
|
16 |
5 April 2005 |
Ken Mason |
AOS/IAS, COC, SUS |
Initial Alignment Requirements on COC Coating Reflectivity |
signed |
|
|
17 |
4 Apr 2008 rev. -02 23 Aug 2005 |
GariLynn Billingsley |
COC, SYS, SUS/UK, SUS/US |
Core Optic sizes, including TMs, BS, FM and RM supercedes
M040283-01 and M040387-00 rev.-03 needed to
be consistent with M070120-02 regarding BS thickness |
signed |
|
|
18 |
16 Nov 2005 |
Tim Hayler |
SUS, AOS |
Separation of chains in quad suspensions |
signed |
|
|
19 |
31 Jan 2006 |
Norna Robertson |
SUS, SYS |
Steel Wires for the Mode Cleaner Suspensions |
signed |
|
|
20 |
28 Feb 2006 |
Dennis Coyne |
AOS, ISC, SUS, COC |
Eliminate the Photon Actuator |
signed |
|
|
21 |
6 Oct 2006 |
Peter King |
PSL, SYS |
Change High Power Laser Front End to a MOPA |
signed |
|
|
22 |
25 Oct 2006 |
Janeen Romie |
SUS, IO, COC |
No Flats on IMC & RM Optics |
signed |
|
|
23 |
14 Nov 2006 |
Phil Willems |
AOS, SUS |
CP Dimensions |
signed |
|
|
24 |
17 Apr 2007 |
Dave Reitze |
IO, COC, SUS |
Dimensions of the Large MMT Mirror (MMT3) and the Recycling Mirrors (PRM & SRM) for the Marginally Stable Recycling Cavities |
Signed |
|
|
25 |
23 Apr 2007 |
Justin Greenhalgh |
SUS, ISC |
Determine need for OSEM sensors for UIM and PUM in the ETM
and ITM and determine need for OSEM cable electrical shielding |
signed |
|
|
26 |
29 May 2008 |
Justin Greenhalgh |
SUS, ISC |
BS & FM suspensions: No reaction chains, B-OSEMs and ½ size magnets |
signed |
|
|
27 |
10 Jul 2007 |
Dennis Coyne |
SEI, SUS, IO,
ISC, SYS |
HAM Optics Table Height |
signed |
|
|
28 |
11 Jul 2007 |
Dennis Coyne |
SUS, SYS |
BS Optic geometry, Wedge Orientation & Metal Wires |
signed |
|
|
29 |
24 Mar 2008 |
Dennis Coyne |
AOS, SUS, COC |
CP and ETM reaction mass have same mass (and CP has no wedge or flats) |
signed |
|
|
30 |
26 Mar 2008 |
Dennis Coyne |
COC, IO, AOS, SUS |
Responsibilities for Elements of the Stable Recycling Cavities |
signed |
|
|
31 |
8 Apr 2008 |
GariLynn Billingsley |
SUS, COC, AOS, ISC |
Transmission requirements for ETM and ERM |
signed |
|
|
32 |
29 Apr 2008 |
Mike Smith |
AOS, SUS, SYS |
Minimum spacing between FM and ITM |
signed |
|
|
33 |
3 Apr 2008 |
GariLynn Billingsley |
COC, SUS, AOS |
Thickness of PR3 and SR3 and symmetric wedge of same |
signed |
|
|
34 |
27 Jun 2008 |
Norna Robertson |
SUS, FMP, INS |
No Fibre Pulling Machine at LLO |
Signed |
|
|
35 |
11 Jul 2008 |
Norna Robertson |
SUS, ISC |
E/ITM and BS/FM pitch frequencies and d-values |
signature process |
Pending RODAs in addition to the unsigned drafts above:
1)
Dummy metal masses to be provided with every
suspension (or is this clear in the work scope already defined for the WBS for
the
2) HAM-ISI requirements have been revised per Peter F.’s analysis – document in RODA [Dennis]
3) Seismic Platform Interferometer (SPI) interfaces to ITM/ETM and BS suspensions [Dennis, Justin, Matt]
4) AOS to provide cameras with sufficient resolution to determine beam size – already part of AOS scope?. [Dennis, Mike S.]
5) The inclusion of B-OSEMs needed in production for tip/tilt mirrors and extra triples (for the stable recycling cavity) will be handled as a reduction in the delivered spare count. If the project later decides it needs more B-OSEMs, the Lab will start up the production again. The IO group may need the lower noise B-OSEMs on SOS. The B-OSEM count has implications for drive electronics and channels as well. [Dave R., Justin, Norna, Rolf]
6) IO may need high dynamic range (high force) coil drives for tip/tilt stages used for beam stabilization (no local sensing). [Dave R., Rich A.]
7) SR2 optical transmission properties for a Hartmann probe beam [Phil W., Dave R.]
Last revised: 13 Jul 2008, 18:52 US-PT