| Optomechanical Layout Working Group Action Items | ||||||
| # | Status | Action Item | Comments/Status | Who | Due | Assigned |
| 1 | Closed | Write ME SolidWorks designer job description & have Ed Jasnow distribute to contracting companies. | Dennis Coyne | ASAP | 12/1 | |
| 2 | Closed | Luke to work on AL mechanical design/CAD in support of AOS. Luke thinks this starts Feb.Dennis to check with Carol & Dave R. | Dennis Coyne | ASAP | 12/1 | |
| 3 | Closed | Get setup with & begin to use PDMWorks | All | ASAP | 12/1 | |
| 4 | Closed | Mike will check to see if there is a way to get continuous ray
lines exported from Zemax: Response: The lines are continuous (not segmented). Each ray has all others as part of its assembly, so there is redundant definition, but this does not seem to be a problem. |
Mike Smith | 12/1 | ||
| 5 | Closed | Determine practical limits for large assemblies in SW -- ask SWs, GoEngineer, Keck Telescope project personnel about best practices | Calum Torrie | Feb-06 | 12/1 | |
| 6 | Closed | Send IO SolidWorks files to Mike Smith for his use in the overall layout and to archive in PDMWorks | Luke Williams | 12/1 | ||
| 7 | Closed | Luke to send Mike his IO layout in SolidWorks including his 3D "skinny" models of triple etc. | Luke Williams | 12/1 | ||
| 8 | Open | Calum & Mike to flesh out the concept of a "high frequency" double pend with a lightweight suspended catcher so that we have (at least) a realistic envelope for layout purposes. | Matlab simulation by Norna? Limiter/stop design for the pendulum? Rough dimensions, spring design done? |
Mike, Calum, Norna | 1/12 | 12/1 |
| 9 | Closed | Mike will forward his lightweight ITM baffle concept/definition to Tim Hayler (RAL) to attach onto the quad SUS. | Mike Smith | 1/5 | 12/1 | |
| 10 | Open | SW/PDMW Model: Define a 3D envelope for the BS suspension | some calculations based on Norna's Matlab design done -- need to complete & generate a 3D envelope model | Dennis Coyne | 1/5 | 12/1 |
| 11 | Closed | Ken & Mike to put the SolidWorks 3D layout into the PDMWorks vault under the project "AL Layouts", including the IO layout files sent by Luke to Mike. | Ken Mailand Mike Smith |
1/5 | 12/1 | |
| 12 | Open | Revise/correct the AL Optical Layout document, T010076-01, consistent with Mike's latest Zemax & SolidWorks layout | Mike Smith Dennis Coyne |
1/19 | 12/22 | |
| 13 | Open | plan for decision on stable recycling cavity | outline: a) define a workable layout, b) Phil determines implications for thermal compensation, c) Hiro develops FFT model to handle analysis of ROC tolerance etc., d) Hiro & Phil apply FFT model to determine if stable & nearly degenerate PRC work | Dennis Coyne Peter Fritschel |
3/29/2006 | 3/9/2006 |
| 14 | Open | layout for marginally stable PRC: can we do with just 5 HAMs? |
in progress | Mike, Luke & Dennis | 3/17/2006 | 3/9/2006 |
| 15 | Open | layout for stable PRC: can we do with just 5 HAMs? |
stable PRC presentations/documents posted to web page | Mike, Luke & Dennis | 3/17/2006 | 3/9/2006 |
| 16 | Open | Simple SEI system representation into PDMW vault | Dennis | 3/17/2006 | 3/9/2006 | |
| 17 | Open | SW/PDMW Model: BSC chamber model with brackets & internal support ring | Dennis | 3/17/2006 | 3/9/2006 | |
| 18 | Open | Hire mechanical designer/draftsperson | in the process of interviewing | Mike, Janeen, Dennis | 3/17/2006 | 3/9/2006 |
| 19 | Open | SW/PDMW Model: PRM & SRM Triple SUS envelope | planform dimensions of an MMT3 with height of a triple? … or does the SUS team have a better definition? | Luke, Janeen, Calum | 3/17/2006 | 3/9/2006 |
| 20 | Open | SW/PDMW Model: quad ETM/ITM controls prototype model | fix broken links, clean up directory | Calum | 4/3/2006 | 3/9/2006 |
| 21 | Open | SW/PDMW Model: FM/ITM combined envelope | rough planform in AutoCAD 2D layout. Needs lots of work to make it real | ? | 5/1/2006 | 3/9/2006 |
| 22 | Open | SW/PDMW Model: Layout with HAM2 moved to +Y side of HAM1 for ISCT readout of REFL & PO beam | Mike & Luke | 3/17/2006 | 3/9/2006 | |